Responds to NRC Re Violations Noted in Insp Rept 50-338/78-34.Corrective Actions:Particulate Filter for RM-RMS-159 Checked for Alarms Per Periodic Test 1-PT-37, & Full Compliance Achieved
ML19274D116
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 12/20/1978
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19274D114 List:
References
NUDOCS 7901120173
Download: ML19274D116 (2)


Text

.

VIRGINIA 13LECTRIC AMD POWEN C O MI% NY RICIIMOND, VIRGIN IA nUnbl December 20,'il 978... g g Mr. James P. O'Reilly, Director Serial No.

691/112778 Office of Inspection and Enforcement P0/DLB:scj U. S. Nuclear Regulatory Com:nission Docket No.

50-338 Region _II License No.

NPF-4 101 Harietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

We have reviewed your letter of November 27, 1978 in reference to the inspection conducted at North Anna Power Station on October 30 - November 3, 1978 and reported in IE Inspection Report No. 50-338/78-34. Our response to the specific deviation is attached.

We have determined that no proprietary information is contained in the report. Accordingly, the Virginia Electric and Powe.r Company interposes no objection to the inspection report being made a matter of public disclosure.

Very truly yours, 6.b?.Jiaung C. M. Stallings Vice President-Power Supply and Production Operations Attachment cc:

Mr. Albert Schwencer 7901120173

  • 720N8 ORPrer A r

RESPONSE TO NOTICE OF DEVIATION LISTED IN INSPECTION REPORT NO.

50-338/78-34 NRC COMMENT Based on the results of the NRC inspection conducted on October 30 -

November 3, 1978, certain of your. activities appear to deviate from your commitments to the Commission as indicated below.

Licensee Event Report No. LER 78-063/03L-0, dated August 21, 1978',

states that the particulate filter for RM-RMS-159 will be checked periodically to verify that it is operating properly, and that the charcoal filter will be changed periodically.

Contrary to the above, no periodic checks of the particulate filter or changes of the charcoal filter had been instituted as of November 2, 1978.

RESPONSE

On December 4, 1978 an update to LER 78-063 was submitted which stated that RM-RMS-159 would be checked for alarms as per periodic test 1-PT-37.

This was done after an engineering evaluation of RM-RMS-159 indicated a visusi inspection of the filter would not be feasible.

It was also found that failure of the filter or paper drive system would appear as alarms on the monitor which would notify the operators to investigate and correct any problems.

1-PT-37 was revised to reflect this on November 27, 1978 and full compliance was achieved at that time.

No further corrective action is required.

.