Forwards IE Insp Rept 50-409/78-14 on 781027-30 & 1103-05. No Noncompliance Noted
ML19274C910
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/30/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML19274C911 List:
References
NUDOCS 7901050331
Download: ML19274C910 (2)


See also: IR 05000409/1978014

Text

~ . _ . ..____.. . ._ . _ .. . .... .......

_ . _ . . .

.

.. ..

.

~

"

    • "*%

UNITED STATES

M,

.

f

t

NUCLEAR REGULATORY COMMISSION

!)'

'

!

j

7. $ ~f.j J

REGION ill

e

799 aoosevsLT noAo

'

GLEN E LLYN, ILLINotS 60137

g,

  • ees*

Nay 3G .378

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. F. W. Linder

General Manager

2615 East Avenue - South

La Crosse, WI

54601

-

Centlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of

this office on October 27-30 and November 3-5, 1978, cf activities

-

!

at LACBWR Nuclear Generating Plant authorized by NRC Operating

License No. DPR-45 and to the discussion of cur findings with

Mr. R. Shimshak at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

exanined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

-

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

Your initial attempts at demonstrating that the containment leak rate

,

at LACBWR was within allowable Technical Specification limits f ailed

on two consecutive occasions in 1975 and 1978.

Consequently, accord-

ing to 10 CFR 50 Appendix J, Section III A.6.b, a Type A test is

required to be performed at each plant shutdown for refueling or

,

approximately every 18 months, whichever occurs first, until two

consecutive Type A tests meet acceptance criteria. The increased

surveillance frequency is required to commence during your next

refueling shutdown.

.

.

.

7901050 %

. _ .. . . _ . _ _ _ _ _ _ _ . ... , _ _ . .. _ ..._. . . _

.

, ' ,

-

Dairyland Power

-2-

NOV 30 378

"

Cooperative

In accordance with Section 2.790 of the NRC's " Rules of

4

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

'

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

,

'

believe to be proprietary, you must apply in writing to this

,

off2ce, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The

,

!

application must include a full statement of the reasons for

'

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

!

We will gladly discuss any questions you have concerning this

inspection.

.

l

Sincerely,

&>. 2

l

James G. Keppler

Director

Enclosure:

IE Inspection

Rpt No. 50-409/78-14

,*

'

i

cc w/ encl:

Mr. R. E. Shimshak, Plant

,

i

Superintendent

Central Files

Reproduction Unit NRC 20b

't

PDR

Local PDR

NSIC

.

TIC

Anthony Roisman, Esq.,

Attorney

1

!

!

!

.

1

-

,

.

-

--

- - - - - - -

.--

-

  1. ,

&

-_