ML19274C847

From kanterella
Jump to navigation Jump to search
Forwards Request for Info on Recirculation Inlet Nozzle Analysis,To Be Delivered in Oral & Written Form at 780707 Meeting
ML19274C847
Person / Time
Site: Salem, Duane Arnold  PSEG icon.png
Issue date: 07/03/1978
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Arnold D
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
References
NUDOCS 7811280030
Download: ML19274C847 (2)


Text

.=

,. w- '

q w

j, k

~~~

July 3, 1978 Dockat No. 50-331 THis DOCllMENTEN3J Iowa Electric Light and Power Company P00R Qup PM e -

At..antion: Mr. Dusne Arnold Pramident IE Towara P.O'. Box 351 Cedar Rapida. IA $2406 Centlement This acmo is to confirm the telephone convaraation betveca Mr. Mayer of your office arl Mr. Knop of our office on July 2,1978.

The attached anelosure contains a list of questions which you rnould be preparad to discuna during the meeting in Washington, D.C.

m July 7.,1978 with NRR. 'IE: liq and Cencral Electric Company.

Va w uld also request that you prepare written responace to these qvostions at a time agreed to betveca the interested parties at the me,ating on July 7. 1978.

Shoulkf;you have any questions regarding this memo please contact R, C.'Inop of this office.

James C. Kepplar Director dnclosures As stated i

ec; w/enelosure Hr. 3, L h mnud, Chief Enginaar Central Filas L W uction Unit NRC 20b PDR 1 meal PDR NSIC TIC S81128063 RIII gp1 especa >

_nY g

k g

g

,n ENCLO5URE DUANE ARNOLD RECIRCULATION INI,ET N0ZZLE ANALYSIS 1.

Provide details of th'e dynamic' analysis perf ormed on the piping, including any flow-induced vibrations considered in the analysis.

2.

Provide piping isometric drawing of the recirculation line shoving all restraints.

3.

Previde summary of nos.zle load-for nach nozzic (thermal, weight and dynsmic loads).

4 Provide a list of design transients used for the stress ans'.ysis (for example:

startup, shutdown, reactor trip, etc. ). Also provide a list of the actual transients seen by the plant to date.

5, Provide the Stress analysis of the inconel safe-end; include load combinations and details of the thermal transient analysia.

4 O

O

.