Forwards IE Insp Repts 50-327/79-12 & 50-328/79-07 on 790205-07.No Noncompliance Noted
ML19273C003
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/26/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19273C004 List:
References
NUDOCS 7906180720
Download: ML19273C003 (2)


See also: IR 05000327/1979012

Text

. .

~.-

..

'?P 'jj

UNITED STATES

n aroug'o,

IO' N

.

NUCLEAR REGULATORY COMMISSION

'

%%[

f

g

,

REGloN 11

  • -

t

101 M ARIETTA STREET. N.W.

ATLANTA, oEoRGIA 30303

%,*****/

NAR 2 61979

In Reply Refer To:

RII:CRM

50-327/79-12

50-328/79-7

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by Mr. C. R. McFarland of this office

on February 5-7, 1979, of activities authorized by NRC Construction Permit

Nos. CPPR-72 and CPPR-73 for the Sequoyah I and 2 facilities, and to the

discussion of our findings held with Mr. G. G. Stack at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discusr. d in the

enclosed inspection report. Within these areas, the inspection corsisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If this

report contains any information that you (or your contractor) believe to be

p rop rie . ..ry , it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of rhich it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2353 067

790618 0 7AO -

~._

.__ _... ____..__ . _ . .

.

MAR 2 61979

i

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

b

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report Nos.

50-327/79-12 and 50-328/79-7

cc w/ encl:

J. E. Gilleland

Assistant Manager cf Power

500C Chestnut Street Tower II

ChatLapooga, TN 37401

G. G. Stack, Project Manager

P. O. B.)x 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

2353 068

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401