ML19273B932

From kanterella
Jump to navigation Jump to search
Forwards LER 79-060/03L-0
Date released: 10/14/2019 Download: ML19273B932


LER 79-060/03L-0 on 790519:fire Barrier Removed to Allow Removal of Hydraulic Snubber,But Continuous Fire Watch Was Not Established.Caused by Faulty Procedure.Mod Made to Hydraulic Snubber Testing Procedure
ML19273B933
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/13/1979
From: Brown R
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19273B933 (3)
Forwards LER 79-060/03L-0
ML19273B931
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/13/1979
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19273B931 (1)