Forwards IE Info Notice 79-11, Lower Reactor Vessel Head Insulation Support Problem. No Action Required
ML19273B638
Person / Time
Site: Cooper 
Issue date: 05/07/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 7906120071
Download: ML19273B638 (1)


Text

, ' [

CENTRAL FILES SuatCO UNITED STATES PDR:HQ

  1. o NUCLEAR REGULATORY COMMISSION

[\\

REGION IV o

l!

E 611 RYAN PLAZA DRIVE, SUITE 1000 USIC 8

AR LINGTON, TEXAS 76011

\\, * * * * * /

May 7,1979 Docket No.

50-298 Nebraska Public Power District ATTN:

J. M. Pilant, uirector Licensing & Quality Assurance Post Office Box 439 Columbus, Nebraska 68601 Gentlemen:

This IE Infonnation Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the information for possible app!icability to their facilities. No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.

Sincerely,

/~

. /lr'x fen-(

Karl V. S it Director

Enclosures:

1.

IE Infonnation Notice No. 79-11 2350 141 2.

List of IE Infonnation Notices Issued in 1979 cc:

L. C. Lessor, Superintendent Cooper Nuclear Station Post Office Box 98 Brownville, Nebraska 68321 Q

I 190612007/

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 IE Infomation Notice No. 79-11 Date: May 7, 1979 Page 1 of 1 LOWER REACTOR VESSEL HEAD INSULATION SUPPORT PROBLEM Virginia Electric and Power Company, North Anna Power Station No. I reported on November 8, 1978, a field modification pertaining to the lower vessel head insulation support system which was not seismically analyzed at the time of modification. A subsequent stress analysis indicated that the ASME Code allowable rtress and the yield stress for the operating base earthquake (0BE) on some of the instrument guide tubes were exceeded.

For the North Anna No. I field modification, the lower vessel head insulation was supported by angle brackets that are clamped onto the gridwork to about 20 of the 53 instrumunt guide tubes. This additional load cn the guide tubes was not considered in the original stress analysis.

The maximum stress occurs in the socket welds between the Thimble guide tubes and the Instrumentation nozzles that penetrate the vessel.

The maximum stress was about 70 percent of the ultimate and, therefore, violation of the pressure boundary wouid not be expected.

VEPC0 plans to modify the supporting arrangement by building a framework undcrneath the insulation, which will take the loading off the guide tubes.

All holders of operating licenses and/or construction permits should be aware of the potential problem of excecding the allowable stress and the yield stress for OBE.

This Information Notice is provided as an early notification of a possibly significant matter.

It is expected that recipients will review the infomation for possible applicability to their facilities. No specific action or response is requested at this time.

If further NRC evaluations so indicate, an IE Circular or Bulletin will be issued to recommend or request specific licensee actions.

If you have questions regarding the matter, please contact the Director of the appropriate NRC Regional Office.

No written response to this information notice is required.

2350 142 7006060158

IE Information Notice No. 79-11 May 7, 1979

~

LISTING 0F IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.

Issued 79-G1 Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an Operating License (OL) or a Construc-tion Permit (CP) 79-02 Attempted Extortion -

2/2/79 All Fuel Facilities Low Enriched Uranium 79-03 Limitorque Valve Geared 2/9/79 All power reactor Limit Switch Lubricant facilities with an Operating License (0L) or a Construc-tion Permit (CP) 79-04 Degradation of 2/16/79 All power reactor Engineered facilities with an Safety Features Operating License (OL) or a Construc-tion Pennit (CP) 79-05 Use of Improper Materials 3/21/79 All power reactor In Safety-Related Components facilities with an Operating' License (0L) or a Construc-tion Permit (CP) 79-06 Stress Analysis of 3/23/79 All Holders of an Safety-Related Piping Reactor Operating License (OL) or a Construction Pennit (CP) 79-07 Rupture of Radwaste 3/26/79 All power reactor Tanks facilities with an Cperating License (OL) or a Construc-tion Permit (CP)

Enclosure Page 1 of 2 2350 143

IE Information Notice No. 79-11 May 7, 1979 79-08 Interconnection of 3/2C/79 All power reactor Contaminated Systems tilth facilities with an Service Air Systems U:ed Operating f.icense As the Source of Breathing (OL) and Pu Proces-Air sing fuel facilities 79-09 Spill of Radioactively 3/30/79 All power reactor Contaminated Resin facilities with an Operating License (0L) 79-10 Nonconforming Pipe 4/16/79 All power reactor Support Struts facilities with a Construction

' Permit (CP) 2350 144 Enclosure Page 2 of 2