ML19273B451

From kanterella
Jump to navigation Jump to search
Forwards LER 1-77-114
Date released: 10/14/2019 Download: ML19273B451


LER 1-77-114 on 771209:following Topping Off of Containment Atmosphere Dilution Tank W/Liquid Nitrogen, a Loop Vaporizer Inlet Valve NP-2713 Would Not Reopen.Caused by Open Limit Switch for Valve Being Out of Adjustment
ML19273B456
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/09/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19273B456 (1)
Forwards LER 1-77-114
ML19273B450
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 01/09/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19273B450 (2)