Text

T k

p ** "G t

W UNITED STATES

,)

4, g-t NUCLEAR REGULATORY COMMISSION fI /

i REGION til g' y g g

799 ROOSE VE LT RO AD g.

G LEN E LLY N, ILLINOIS 6013 7 y'

1 Docket No. 50-346 Toledo Edison Company ATTN:

Mr. James S. Grant Vice President - Energy Supply Edison Plaza 300 Madison Avenue Toledo, OH 43652 Gentlemen:

Enclosed is a supplement (IE Bulletin No.78-12B) to IE Bulletin No. 78-12 and 12A which requires action by you with regard to your power reactor facility with an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required by you, please contact this office.

Sincerely, OM

[JamesG.Keppler Director

Enclosures:

1.

IE Bulletin No.78-12B 2.

List of IE Bulletins Issued in Last Twelve Moa*.hs cc w/encls:

Mr. T. Muris Station Superintendent Central Files Director, NRR/DPM Director, NRR/ DOR PDR Local PDR NSIC

./ TIC U. Young Park, Power Siting Commission 790403OO7f

h U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III March 19, 1979 IE Bulletin No.78-12B ATYPICAL WELD MATERIAL IN REACTOR PRESSURE VESSEL WELDS Description of Circumstr.nces:

This Eulletin is a supplement to IE Bulletins 78-12 and 12A and all three documents must be collectively considered to provide an adequate response to the bulletins.

Following the issuance of IE Bult: tin 78-12A, members of the Office of Inspection and Enforcement staff met with representatives from the reactor vessel manufacturers and suppliers to discuss the requiremer.ts of the bulletins.

During these meetings, detailed interpretation of the data requirements was provided based on the manufacturer's respective methods of fabrication and record systems.

Recognizing that the scope of the record review is extensive, additional time to respond to the bulletins is provided by this supplement.

Action to b2 Taken by Licensees and Permit Holders:

This bulletin applies to all power reactor facilities with an operating license or a construction permit, except those already identified as possibly having atypical weld material.

Responses to the requirements in Bulletins 78-12 and 12A shall be submitted in writing in accordance with the folloaing schedule:

1.

Generic reports from each reactor vee:a1 manufacturer shall he submitted to the NRC by May 1, 1979, 2.

The licensee responses shall be submitted by May 29, 1979. The licensee's r,eponse sha1.1 include all of the specific vessel information required by the bulletins which is not covered by the vessel manufaqrurers g2neric report and shall indicate that the licensee is satisfied that the generic report adequately represents data for the specific vessels covered by the licensee's report.

Approved by GAO, B180225 (R0072); clearance expires 7/31/80. Approval was given under a blanket clearance specifically for identified generic

problems, r

1-(j y Y I

790dO2 5 0 c g

G "9

$ hh 6*

.*e

4 IE Bulletin No.78-12B March 19, 1979 LISTING OF IE BULLETINS ISSUED IN LAST TWELVE MONTHS Bulletin Subject Date Issued Issued To No.

78-05 Malfunctioning of 4/14/78 All Power Reactor Circuit Breaker Facilities with an Auxiliary Contact OL or CP Eechanism-General Model CR105X 78-06 Defective Cutler-5/31/78 All Power Reactor Hammer, Type N Relays Facilit es with an With DC Coils OL or CP 78-07 Protection afforded 6/12/78 All Power Reactor Facilities with an by Air-Line Respiratot a and Supplied-Air Hoods OL, all class E and F Research Reactors with an OL, all Fuel Cycle Facilities with an OL, and all Priority 1 Material Licensees 78-08 Radiation Levels from 6/12/78 All Power and Tu: 1 Element Transfer Research Reactor Tubes Facilities with a Fuel Clement transfer tube and an OL.

78-09 BWR Drywell Leakage 6/14/79 All BWR Power Paths Associated with Reactor Facilities Inadequate Drywell with an OL or CP Closures 78-10 Bergen-Paterson 6/27/78 All BWR Power Hydraulic Shock Reactor Facilities Suppressor Accumulator with an OL or CP Spring Coils Page 1 of 2

~

's 4

(

IE Bulletin No.78-12B March 19, 1979 LISTING OF IE BULLETINS ISSUED IN LAST TWELVE MONTHS Bulletin Subject Date Issued Issued To No.

78-11 Examination of Mark I 7/21/78 BWR Power Reactor Containment Torus Facilities for Welds action: Peach Bottom 2 and 3, Quad Cities 1 and 2, Hatch 1, Monti-cello and Vermont Yankee 78-12 Atypical Weld Material 9/29/78 All Power Reactor in Rer: tor Pressure Facilities with an Yessel Welds OL or CP 38-12A Atypical Weld Material 11/24/78 All Power Reactor in Reactor Pressure Facilities with an Vessel Welds OL or CP 78-13 Failures In Source Heads 10/27/78 All general and of Kay-Ray, Inc., Gauges specific licensees Models 7050, 7050B, 7051, with the subject 7051B, 7060, 7060B, 7061 Kay-Ray, Inc.

and 7061B gauges 78-14 Deterioration of Buna-N 12/19/78 All CE BWR facilities Components In ASCO with an OL or CP Solenoids 79-01 Environmental Qualifica-2/8/79 All Power Reactor tion of Class IE Equipment Facilities with an OL or CP 79-02 Pipe Support Base Plate 3/2/79 All Power Reactor Designs Using Concrete Facilities with an Expansion Anchor Bolts OL or CP 79-03 Longitudinal Weld Defects 3/12/79 All Power Reactor in ASME SA-312 Type 304 Facilities and an Stainless Steel Pipe OL or CP Spools 7*aufactured by Youngstown Welding and Engineering Company Page 2 of 2

.