ML19270H549
| ML19270H549 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/11/1973 |
| From: | Jennifer Davis US ATOMIC ENERGY COMMISSION (AEC) |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML19270H548 | List: |
| References | |
| CDR-207, NUDOCS 7911070711 | |
| Download: ML19270H549 (1) | |
Text
.
s e
J.P.0'Rei' _
R0:I FS&EB ACTION C0 m OL FORM A.
Action Code CDR#207 Name of Licensee and Facility Metrocolitan Edison Company (Three Mile /
Docket No. or License No.
50-289 Title Partial Drainino of Reactor Coolant System Origin R0:I Date Rec'd 12/10/73 B.
FS&EB Branch Coordinator:
Bryan Dreher X
Ellis Paulus Cot:plet,1on Requested by C.
Action Requested of:
ADREFP MSPPOB EPB RPB ADC0 OB CB TAB 00E Region I
Date Requested 12/11/73 Completion Requested by Reference CDR Evaluation dated'12/4/73 l
D.
Action Requested The Metropolitan Edison Company CDR of 12/4/73 covering the partial drain-ing of 'the reactor coolant system is being assigned to Region I for evaluation of technical adequacy of the corrective action being taken i
and final resolution of the deficiency.
l t
2383 558 E.
Date Action Co=pleted Close-out (Date & Method)
Con:=ents : If co=pletion date is not consistenc with your work schedule, please let us know.
~
JohnG.TaviDDiputyDirector for Field Operations Directorate of Regulatory Operations
,/
.7h T9110707/f/