ML19270H450

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-271/79-05 on 790319-23.No Noncompliance Noted
ML19270H450
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/02/1979
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Groce R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML19270H451 List:
References
NUDOCS 7908270058
Download: ML19270H450 (2)


See also: IR 05000271/1979005

Text

Yb

a

,

UNITED STATES

p prog,

o

NUCLEAR REGULATORY COMMisslON

3 ,( [ g

REGION 1

.\\'M-

'.g

631 PARK AVENUE

$%%),, / f

KING OF PRUSSI A, PENNSYLVANIA 19406

-*..../

JUL 2 T373

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Robert H. Groce

Licensing Engineer

20 Turnpike Road

Westborough, Massachusetts

01581

Gentlemen:

Subject:

Inspection 79-05

This refers to the inspection conducted by Mr. L. H. Thonus of this office

on March 19-23 at Vermont Yankee Nuclear Power Station, Vernon Vermont of

activities authorized by NRC License No. DPR-28 and to the discussions of

our findings held by Mr. Thonus with W. F. Conway and others of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, measurements

made by the inspector, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor) believe

to be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure. Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document or

part sought to be withheld, and which contains a statement of reasons which

addresses with specificity the items which will be considered by the Commission

as listed in subparagraph (b)(4) of Section 2.790.

The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document

Room.

190Bgq0N

,

.

Vermont Yankee Nuclear Power Corporation

2

No reply to this letter is required; however, should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

-

,

,

lI

l'

'

Ll,

y /,

'-

.. n

Georg(e H./ Smith, Chief

cy , i . .. u . .w '-

~

FueT Facility and Materials Safety

Branch'

/

Enclosure:

Office of Inspection and Enforcement Inspection

Report Number 50-271/79-05

cc w/ encl:

W. F. Conway, Plant Superintendent

Ms. J. Abbey, Technical Secretary

A. Z. Roisman, Natural Resources Defense Council (Without Report)