ML19270H100

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-10 Re Operating Requalification Training Programs.W/Table 1 Containing Info Requested in Items 1-5
ML19270H100
Person / Time
Site: Brunswick  
Issue date: 05/24/1979
From: Utley E
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GD-79-1361, NUDOCS 7906230017
Download: ML19270H100 (3)


Text

. -

-. _ - ~. ~ ~ _.... -... -

.,-~.,....,.n..:.--

.w

.w Me

=

$Nb Carolina Powcr % l'Oht Company May 24, 1979 FILE: NG-3513 (B)

SERIAL:

GD-79-1361

(.o "c

- to Mr. James P. O'Reilly, Director 5

>Z U. S. Nuclear Regulatory Commission

[

!.Q Region II cn

>7 101 Marietta Street, Suite 3100

-m Atlanta, GA 30303

' '. 2 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 & 2 LICENSE NOS. DPR-71 AND DPR-62 M

DOCKET NOS. 50-325 A!!D 50-324 RESPONSE TO IE BULLETIN 79-10

Dear Mr. O'Reilly:

In response to ycur letter of Maj 11, 1979, transmitting IE Bulletin 79-10, Carolina Power & Light Company submits the following information:

Five items regarding operator requalification training programs were addressed in the IE Bulletin. Enclosed is Table I containing the information requested in Items 1-5.

We trust that this information satisfies the request of IE Bulletin 79-10.

Very truly yours,

.-g. g/,

,9

f. 'E d.

$t E

Utley

/

Executive Vice President Power Supply RMP/CSB/jnh*

Enclosure cc:

Mr. R. A. Hartfield Mr. E. Volgenau J

'7 90623 0 D/ f c = ===::xw n =

= =, = = = =

st cot.,

.)

?. 15,,. re,,

N C..'602 c

2 "ak.s. a-

-'3W T=WL"d7.E7EC$%3

/

m

_,,, nn

7 TABLE 1 Utility:

Carolina Power & Light Company Date: May 18, 1979 Facility:

Brunswick Steam Electric Plant Unit Nos. 1 and 2 Operatora Senior Operators Exam Exam Exam Exam Exaia Exam Exam Exam 1

2 3

4 1

2 3

4 1.

Actica 1: Responses A.

Total number failed 0

0 0

0 1

0 0

0 annual examinatica E.

Percent that failed 0

0 0

0 6

0 0

0 annual exacination 2.

Action 2: Responses A.

Percent required to 100 100 63 50 94 77 88 67 attend additional lectures B.

Number of operators 1/5 1/3 4/1 1/1 2/1 7/1 9/1 7/1 attending specified 1/4 1/3 2/2 3/3 4/2 4/2 number of lectures (no.

1/5 4/3 3/4 1/3 1/3 of operators /no. of 3/4 lectures) 4/5 1/6 3.

Action 3: Responses A.

Total number attending 0

0 0

0 1

0 0

0 accelerated training because 70 percent on annual written exacina-tion B.

Percent attending 0

0 0

0 6

0 0

0 accelerated training lesson because 70 per-cent on annual written exacination 2247 085

TABLE 1 (Cont'd)

Operators Senior Operatora Exam Exam Exam Exam Exam Exam Exam Exam 1

2 3

4 1

2 3

4 c.

Total number attending 0

0 0

0 0

0 0

0 accelerated training because unsatisfactory oral examination D.

Percent attending 0

0 0

0 0

0 0

0 accelerated training because unsatisfactory oral examination Date of Exam 1 11-3-75 to 11-14-75 2 6-76 and 1-77 3 1-13-78 4

11-14, 11-15, and 11-29-78 2247 086

.