Submits Addl Info to Fire Protection Sys Re Alternatives to Increase Pumping Capacity of Fire Water supply.Diesel-driven Fire Pump of Sufficient Capacity Will Be Provided to Meet NRC Concerns
ML19270G755
Person / Time
Site: Yankee Rowe
Issue date: 06/13/1979
From: Moody D
YANKEE ATOMIC ELECTRIC CO.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
WYR-79-67, NUDOCS 7906190227
Download: ML19270G755 (1)


Text

,

og O/d.

Telephone 617 366-9011 TWK 710 390-0739 YANKEE ATOMIC ELECTRIC COMPANY n321 WYR 79-67

=

= Y m_Tk ?

20 Turnpike Road Westbcrough, Massachusctts 015M

<te

~

June 13, 1979 United States Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

D. L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors

References:

(a) License No. DPR-3 (Docket 50-29)

(b) USNRC letter to YAEC dated March 15, 1979

Subject:

Amendment 56 to Facility Operating License (c) YAEC letter WYR 79-45,

Subject:

Submittal Schedule

Dear Sir:

Subject:

Additional Fire Protection System Information As indicated in Section 3.2.2 of reference (b) above, Yankee Atomic has been evaluating alternatives to increase the pumping capacity of the fire water supply.

We have evaluated the available alternatives, and propose the following:

Yankee Atomic will provide a diesel-driven. fire pump of sufficient capacity to meet the NRC concerns expressed in reference (b).

Sucticn to the pump will be from the fire pond to be constructed on the plant site.

Connection to the yard fire main will be at a point remote from the two motor-driven pump connections.

Installation'of the increased pumping capacity will be on a schedule commensurate with the installation of other major fire protection system modifications, with completion by the end of the 1980 refueling interval.

We trust that this conmitment responds adequately to your concerns.

We find that the schedule for submittal of information on SER paragraph 3 1.7, Switchgear Room Gas Suppression System, was inadvertently left out of reference (c) above.

That date will be July 1,-1979 If you have any further question or comment on,the above commitment, please contact us.

Very truly yours, 2344

~

\\

Q.:

y.

f D. E. Moody' Manager of Operations