ML19270G620

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-312/79-04 on 790226-0302.No Noncompliance Noted
ML19270G620
Person / Time
Site: Rancho Seco
Issue date: 04/25/1979
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19270G621 List:
References
NUDOCS 7906140190
Download: ML19270G620 (2)


See also: IR 05000312/1979004

Text

W

M%

c

4,.

UNITED STATES

,k

NUCLEAR REGULATORY COMMISSION

'

3 ! ) /l

S

nccion v

SulTE 202, W ALNUT CREEK PLAZ A

9

,

4

,o

1990 N. C ALIFOR NI A DOULEV A HD

'*

9 #eee*

W ALNUT CREEK C ALIFORNI A 94596

APR 2 5 G79

Docket No. 50-312

Sacramento Municipal Utility District

ATTN: Mr. John J. Mattimoe

Assistant General Manager and

Chief Engineer

P. O. Box 15830

Sacramento, California 9581%

Gentlemen:

SUBJECT:

NRC PERFORMANCE APPRAISAL BRANCH INSPECTION AT RANCHO SECO

This refers to the inspection conducted by W. D. Shafer of the

Performance Appraisal Branch of Inspection and Enforcement, on

February 26 - March 2,1979, of activities authorized by NRC

Op' rating License flo. DPR-54, and to the di<,cussion of our find-

ings held by Mr. Shafer with Mr. Rodriguez and other members of

your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you be-

lieve to be proprietary, it is necessary that you submit a written

application to this office, within 20 days of the date of this letter,

requesting that such information be withheld from public disclosure.

2270 216

!

l

!

7906140/70

.

l

.

A?E 'S U 07'S

Sacramento Municipal Utility District

-2-

i

!

The application must include a full statement of the reasons why it

is claimed that the information is proprietary. The application should

be prepared so that any proprietary infornation identified is contained

in an enclosure to the application, since the application without the

enclosure will also be placed in the Public Document Room.

If we do

not hear from you in this regard within the specified period, the re-

port will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sinc rely,

/

J/

L. CrttflU

';

ws, Chief

P,eactor Operations and

tiuclear Support Branch

Enclosure:

IE Inspection Report

?!o. 50-312/79-04

cc w/o enclosure:

R. J. Rodriguez, SMUD

L. G. Schwieger, SMUD

2270

217

i

i