Forwards IE Insp Repts 50-321/79-10 & 50-366/79-12 on 790314-0316.No Noncompliance Noted
ML19270G571
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/03/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19270G570 List:
References
NUDOCS 7906140085
Download: ML19270G571 (2)


See also: IR 05000321/1979010

Text

.

.

e

pa 8f 0

UNITED ST ATES

[

0g[o

NUCLEAR REGULATORY COMMISSION

g

REGION ll

{

c

g

101 M ARIETTA ST REET. N.W.

E

[

ATLANT A. GEORGI A 30303

o,

  • % * . . + +o

APR 0 31979

In Reply Refer To:

RII:DGH

50-321/79-10

50-366/79-12

Georgia Power Company

Attn:

Mr. J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street, N.W.

Atlanta, Georgia 30303

Gentlemen:

This refers to the inspection conducted by Mr. D. G. Hinckley of this

office on March 14-16, 1979 of activities authorized by NRC License Nos.

DPR-57 and NPF-5 for the E. 1. Hatch facility, Units 1 and 2, and to the

discussion of our findings held with Mr. M. Manry at the conclusion of

the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC*s " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application witain 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

2270 010

7D061400gg,

x

.

.

.

' 3R U 3 1373

s

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

(l

(h

,'

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-321/79-10

and 50-366/79-12

cc w/ enclosures:

Mr. M. Manry, Plant Manager

Plant E. I. Hatch

Post Office Box 442

Baxley, Georgia 31513

Mr. C. E. Belflower

Site QA Supervisor

Plant E. I. natch

Post Office Box 442

Baxley, Georgia 31513

2270