ML19270G525

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Failure to Properly Consider Application of Certain Postulated Loads in Interior Structural Steel Beams.Deficiency Would Not Have Resulted in Significant Safety Hazard
Date released: 10/11/2019 Download: ML19270G525


Final Deficiency Rept on 781025:beam-to-column Connections.Caused by Human Error & Inadequate Procedural Training.Beams Have Been Reanalyzed,Errors Corrected & Calculations Design Verified
ML19270G526
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/05/1979
From:
HOUSTON LIGHTING & POWER CO.
To:
References
Download: ML19270G526 (8)
Forwards Final Deficiency Rept Re Failure to Properly Consider Application of Certain Postulated Loads in Interior Structural Steel Beams.Deficiency Would Not Have Resulted in Significant Safety Hazard
ML19270G524
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 06/05/1979
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19270G524 (2)