Notice of Violation from Insp on 790220-23
ML19270G175
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/23/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19270G164 List:
References
50-366-79-09, 50-366-79-9, NUDOCS 7906050091
Download: ML19270G175 (1)


Text

_.

APPENDIX A NOTICE OF VIOLATION Georgia Power Company License No. NPF-5 E. I. Hatch, Unit 2 Based on the NRC inspection February 20-23, 1979, certain of your activi-ties were apparently not conducted in full compliance with NRC require-ments as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by Paragraph 16.1, Section 16, " Corrective Action" of the Plant Hatch Quality Assurance Manual, " measures shall be established to assure that conditions adverse to quality...are promptly identified and corrected", and "in the case of significant conditions adverse to quality, the measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition".

Contrary to the above, after the need for revision of the Core Maximum Peaking Factor (CMPF) design value was identified in Plant Hatch Deviation Report No.78-444, dated 8/11/78, corrective action to preclude use of the old, incorrect CMPF was inadequate evidenced by its use in the following Startup Test Procedures:

HNP-2-10422, Pressure Regulator (Attachment E/11 dated 10-13-78)

HNP-2-10522, Pressure Reguistar (Attachment E/19 dated 10-28-78)

HNP-2-10625, MSIV (Attachment D/33 dated 10-26-78)

This is an infraction.

7 9 0 S 0 5 0egt