Forwards IE Insp Repts 50-454/79-05 & 50-455/79-05 on 790321-0323.No Noncompliance Noted
ML19270G147
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/06/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19270G148 List:
References
NUDOCS 7906050054
Download: ML19270G147 (2)


See also: IR 05000454/1979005

Text

.

A

g#

4

UNITEo STATES

  1. -

NUCLEAR REGULATORY COMMISSION

ff

,$

REGloN lil

q

f

799 ROoSE VE LT RoAo

,

% * y.,

GLEN E LLYN. ILLINol5 60137

a...*

APR 0 61979

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

,

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Messrs. E. J. Gallagher

and J. F. Suermann of this office on March 21-23, 1979, of

activities at Byron Nuclear Generating Station, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-130 and CPPR-131

and to the discussion of our findings with Mr. Sorensen and others

of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

7906050OfI

.

<

.

Commonwealth Edison

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiore111, Chief

Reactor Construction and

,

3

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-454/79-05

and No. 50-455/79-05

c s- w/ encl:

Gunnar Sorensen, Site Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSI.C

tMC

tk. Dean Hansell, Of fice of

Assistant Attorney General

,