Forwards IE Insp Repts 50-518/79-05,50-519/79-05, 50-520/79-05 & 50-521/79-05 on 790220-23.No Noncompliance Noted
ML19270G058
Person / Time
Site: Hartsville  
Issue date: 04/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19270G059 List:
References
NUDOCS 7906010322
Download: ML19270G058 (2)


See also: IR 05000518/1979005

Text

pg MRA

sd

C9 [8

UNITED STATES

fg* MGuq[o,,

6

NUCLEAR REGULATORY COMMISSION

g

REGION 11

$

101 M ARIETT A STREET, N.W.

h8[

O

3,

o

5

M

bI

J

ATLANTA, GEORGI A 3o303

,

%, *'

/

APR e 2 7979

In Reply Refer To:

RII:WBS

50-518/79-5

50-519/79-5

50-520/79-5

50-521/79-5

Tennessee Valley Authority

Attn:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower 11

Chattanooga. Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr .

W. B. Swan o f this of fice on

February 20-23, 1979 of activities authorized by NRC License sos. cPPR-150,

CPPR-151, CPPR-152 and CPPR-153 f or the Hartsville Al, A2, B1 and B2 f acilities,

and to the discussion of our findings held with Mr. R. T. Hathcote at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these a reas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with rega rd to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice" Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the hRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this of fice to withhold such inf ormation from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the i n f o rma t i on is proprietary, and should

be prepared so that proprietary information ider4tified in the application

is

contained in a separate part of the document.

I f we do not hear f rom you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2237 040

7 906 0103dM

a

.

APR 0 21979

Tennessee Valley Authority

-2_

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

'$

f

'*

,-

Charles E. Murphy,

hief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-518/79-5,

50-519/79-5, 50-520/79-5 and

50-521/79-5

cc w/ enclosures:

Mr. J. E. Gilleland

Assistant Manager of Power

Tennessee Valley Authority

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

Mr. T. E. Wills

Project Engineer

Tennessee Valley Authority

400 Chestnut Street Tower II

Chattanooga, Tennessee 37401

Mr. R. T. Hathcote, Project Manager

Hartsville Nuclear Plant

Post Office Box 2000

2237 04I

Hartsville, Tennessee 37074

Mr. J. F. Cox

400 Commerce Street

W10C131C

Knoxville, Tennessee 37902