ML19270F987

From kanterella
Jump to navigation Jump to search
Informs That Measurement Control Plan Incorporated as License Condition on 790308 Contains Mistakes Re Calculation of Systematic Errors.To Correct Mistakes,Adds Condition 4.10 to Amend MPP-2,to Be Effective 790407
ML19270F987
Person / Time
Site: Wood River Junction
Issue date: 03/22/1979
From: Partlow J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Bowers C
UNITED NUCLEAR CORP. (SUBS. OF UNC, INC.)
References
NUDOCS 7904090321
Download: ML19270F987 (1)


Text

s s f

f.p uco\\

UNITED STATES V

,4 NUCLEAR REGULATORY COMMISSION js )L(

j s,

[a/)p/

U, WASHINGTON, D. C. 20555 MAR 2 21979 S GML : 'iEG 70-82(.

United Nuclear Corporation Fuel Recovery Operation ATTN:

Mr. C. E. Bowers General Manager Wood River Junction, Rhode Island 02893 Gentlemen:

We have determined that your measurement control plan incorporated as a condition of license on March 8,1979 contains mistakes concerning the calculation of systematic errors.

Since bias and systematic error variance have to be determined, the correct method of calculating 2

2 the variance is by S /n + So.

In order to correct these mistakes, we s

are adding a new Condition 4.10 to Amendment MPP-2 to Special Nuclear Material (SNM) License No. SNM-777 to be effective on April 7,1979.

This condition reads as follows:

4.10 Notwithstanding the equations in Section 4.2.4.2 of the Plan identified in Condition 2.1, the licensee shall use the following equation to calculate systematic errors:

2 2

3 /n + So2 Vs

=

In order to remove this condition and maintain your Fundamental Nuclear Material Control Plan as a basic, comprehensive document, we request that you submit revised pages correcting the mistakes within fifte r.

days.

If you have any questions concerning this matter, I will be pleased to hear from you.

Sincerely,

\\-; %

James G. Partlow, Chief Ma terial Control and Accountability I Licensing Branch Division of Safeguards 7900.090 3:2/