ML19270F728

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-327/79-06 on 790116-19.No Noncompliance Noted
ML19270F728
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/09/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19270F729 List:
References
NUDOCS 7903210039
Download: ML19270F728 (2)


See also: IR 05000327/1979006

Text

'

- A

RMN

UNITED STATES

g#o

f.

NUCLEAR REGULATORY COMMISSION

c& Sr' '

g

[

REGloN il

ri

5

g

101 M ARIETTA STREET, N.W.

ATLANTA, GEORGIA 303o3

/

%, * * *lll**,

FEB

9 1979

In Reply Refer To:

RII:PKV

50-327/79-06

Tennessee Valley Authority

Attn:

Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by Mr. P. K. VanDoorn of this

office on January 16-19, 1979 of activities authorized by NRC License

No. CPPR-72 for the Sequoyah Nuclear Plant facility, Unit 1, and to the

discussion of our findings held with Mr. C. E. Cantrill at the conclusion

of the inspection.

Areas examined durit g the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

7903210 039

,,

y

(

.

FEB

9 1979

-

-

.

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Charles E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

Inspection Report No. 50-327/79-06

cc w/ enclosure:

Mr. J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower II

Chattanooga, Tennessee 37401

Mr. G. G. Stack, Project Manager

Sequoyah Nuclear Plant

Post Office Box 2000

Daisy, Tennessee 37319

Mr. J. M. Ballentine

Plant Superintendent

Sequoyah Nuclear Plant

Post Office Box 2000

Daisy, Tennessee 37319

Mr. J. F. Cox

400 Commerce Street

W10C131C

Knoxville, Tennessee 37902

--