Forwards LER 79-005/01T-0 & 79-008/01T-0
Date released: 10/11/2019 Download: ML19270F517


LER 79-008/01T-0 on 790129:design Flow of 37 Gpm to Charging Pump Coolers Could Not Be Met.Caused by 2 Inch Carbon Steel Piping & Charging Pump Skid Piping Being Too Large to Allow Adequate Flow
ML19270F519
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/12/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F519 (2)
LER 79-005/01T-0 on 790129:mufflers for Emergency Diesel Generators Not Seismically Supported Nor Missile Protected as Required by Fsar.Caused by Const Error
ML19270F518
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/12/1979
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F518 (2)
Forwards LER 79-005/01T-0 & 79-008/01T-0
ML19270F516
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/12/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F516 (1)