ML19270F049

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Chemical & Volume Control Sys Piping Sys Lateral Restraints
Date released: 10/11/2019 Download: ML19270F049


Deficiency Rept:Lateral Restraint Needed During a Seismic Event Was Omitted from the High Pressure Chemical & Volume Control Piping Sys in Auxiliary Bldg.Replacement Will Be Designed & Installed by 790401
ML19270F055
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/12/1979
From:
TENNESSEE VALLEY AUTHORITY
To:
References
Download: ML19270F055 (1)
Forwards Final Deficiency Rept Re Chemical & Volume Control Sys Piping Sys Lateral Restraints
ML19270F047
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 01/12/1979
From: Gilleland J
TENNESSEE VALLEY AUTHORITY
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270F047 (2)