ML19270F013

From kanterella
Jump to navigation Jump to search
Responds to NRC Ltr of 781129 Re Violation Noted in Insp Rept 50-302/78-26.Corrective Actions:Satisfactory Performance of Next Scheduled Surveillance Procedure SP-132 Indicated Corrective Action Was Taken
ML19270F013
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/19/1978
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19270F009 List:
References
NUDOCS 7901110160
Download: ML19270F013 (2)


Text

g e * * ,' ; * '

LE ',

  • (

t .

\r *

'.+

Florida W 19 December 1978 3-0-3-a-2 CS-78-257 a

u Mr. J. P. O'Reilly, Director Docket No. 50-302 Office of Inspection & Enforcemee. License No. DpR-72 U.S. Nuclear Regulatory Commission RII:JE0 101 Marietta St., Suite 3100 50-302/78-26 Atlanta, GA 30303

Dear Mr. O'Reilly:

We offer the following response to the apparent Item of Noncompliance in the referenced Inspection Report.

NOTICE OF VIOLATION A. Technical Specification 6.8.1 states, in part: " Written procedures shall be established, implemented, and maintained, covering the activities referenced...C. Surveillance and Test Activities of Safety Related Equipment." Additionally, Paragraph 3.2.1.1 of AI-700, " Administrative Instructions for Conduct of Technical Services", states, in part, "NonConformance to acceptance criteria or Technical Specifications shall be called to the attention of the Technical Support Engineer. He will document the problem according to CP-113. " Procedure for Handling Work Requests..."

Contrary to the above, Data Sheet IV, of SP-132, Engineered Safeguards Channel Calibration, dated September 9, 1977, indi-cated that RC-3B-PT3 failed to meet the listed acceptance criteria and no corrective action was taken.

A. Response: During the course of the inspection, documented proof that corrective action had been accomplished for this infraction could not he produced. However, the satisfactory performance of the next scheduled SP-132 was indicative of corrective action having been accomplished.

A review of this violation was held and all concerned personnel were counseled as to the consequences of this citation. All personnel were directed in writing to notify their supervisor 7901110(60 r- r . - n u . - n , ,, , , , . .,,....c. .c,,.... p n n. .-,,c. n. ... , , _ , m - , , w n a,, u,a 1 0015

< ,. OFFICIAL rW

. s J. P. O'Reilly Ref: RII:JE0 50-302/78-26 Page 2 immediately when the acceptance criteria of any Surveillance Procedure on Safety Related Equipment is not met. In the future, no Surveillance Procedure on Safety Related Equipment will be transmitted as being completed until all acceptance criteria has been met. Full compliance has been achieved this date.

Should there be further questions, please contact us.

Very truly yours, FLORIDA POWER CORPORATION ,

LO.hDtuSno\

W. P. Stewart Director, Power Production Nu'e lea r ~ ' ant Manager JC/rc xc: G.R.Westafer