ML19270E881

From kanterella
Jump to navigation Jump to search
Forwards LER 78-094/03L-0
Date released: 10/11/2019 Download: ML19270E881


LER 78-094/03L-0 on 781122:demineralized Water Storage Tank Level Was Too Long Due to High Usage & Acid/Caustic Equipment Failure.Level Returned to Tech Spec Limits within 1 Hour
ML19270E886
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/29/1978
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270E886 (2)
Forwards LER 78-094/03L-0
ML19270E880
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/29/1978
From: Banks H
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19270E880 (1)