b n pecg o
UNITED STATES "g
8 NUCLEAR REGULATORY COMMISSION g
ti. @
- K REGION IV S
g 611 RYAN PLAZA DRIVE, SulTE 1000 U
%.'.\\#
o AR LINGToN. TEX AS 7G012 0 6 SEP 1979 Docket No.
99900036/79-02 Combustion Engineering, Inc.
ATTN:
Mr. W. A. Stone Qun'4tf Assurance Manager 911 West Main St.
Charr ~ cga, Tennessee 37402 Gentlemen:
This refers to the QA Program inspection conducted by Mr. I. Barnes of this office on August 13-17, 1979, of your facility at Chattanooga, Tennessee, associated.cith the fabrication of reactor pressure vessels and nuclear piping assemblies and to the discussions of our findings with Mr. J. T. Rich and members of your staff at the conclusion of the inspection.
This inspection was made to confirm th4t, in the areas inspected, your QA Program is being effectively implemented.
The inspection effort is not designed to assure that unique quality requiremer.ts imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you~to your customers, is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from oth
's.
You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.
Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the
' inspector.
During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been or will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.
2166 010 7 912210 OM
Combustion Engineering, Inc.
2 In a,ccrdance with Section 2.790 of the Commission's " Rules of Practice,"
Pr.c 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclo~ sed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the informa-tion is preprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the reporr will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/
-g n
Uldis Potapovs, Chief Vendor Inspection Branch
Enclosures:
1.
Notice of Deviation 2.
Inspection Report No. 99900036/79-02 2166 011 4