ML19269F385

From kanterella
Jump to navigation Jump to search
Forwards NRC 791206 Order Modifying CPs Re Soil Foundation Matls Onsite
ML19269F385
Person / Time
Site: Midland
Issue date: 12/06/1979
From: Case E, Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
To: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML19269F386 List:
References
NUDOCS 7912200642
Download: ML19269F385 (1)


Text

-

'l/C o,,

UNITED STATES NUCLEAR REGULATORY COMMISSION g

g C

WASHINGTON. D. C. 20555

$,[***** $

p December 6,1979 Docket Nos. 50-329 50-330 Consumers Power Company ATTN:

Mr. Stephen H. Howell Vice President 1945 West Parnall Road Jackson, MI 49201 Gentlemen:

This letter transmits to you an Order Modifying Construction Permits No.

CPPR-81 and No. CPPR-82.

This action is being taker, as a result of findings by inspectors from Region III, Office of Inspection and Enforcement made during the period of October 1978 to Jan.1ary 1979, and the conclusions of the NRC staff after reviewing responses to the 10 CFR 50.54(f) request of March 21, 1979, regarding the proposed remedial work under and around safety-related structures and systems at the site, some of which is currently underway.

The Order pertains to the problems associated with the soil foundation materials at the site.

As part of the Order there are two Notices of Violatio.a.

The first Notice of Violnion is Appendix A which contains information concerning four infractions wi% several examples, all of which relate to the soil foundation problems.

The second Notice of Violation, Appendix B, contains information concerning an item of noncompliance which was determined to be a material false statement.

Actions t at Consumers Power Company may take as a result of this Order are described in the Order.

Sincerely, Sincerely, r)

Edson G.

ase Victor Stello, r.

Acting Director Director Office of Nuclear Reactor Office of Inspection Regulation and Enforcement

Enclosures:

1.

Order Modifying Construction Permit;, CPPR-81 and CPPR-82 2.

Appendix A 3.

Appendix B CERTIFIED MAIL RETURN RECEIPT REQUESTED 7912200 ek