ML19269E853

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-10 Re Requalification Training Program Statistics.Forwards Format of Annual Examination
ML19269E853
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/21/1979
From: Stewart W
FLORIDA POWER CORP.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7906290730
Download: ML19269E853 (3)


Text

r/ c 6 5 - 5 ff 2 -

,O;,4r.0.*

"4 C

f:Dm; 9 g.

e

. : :,,4

  • 2., =9 4..

, '=.,, a)0:

y

~,%,ee..*,e w

co Florida e

P...o. w..e..,r May 21, 1979 Mr. J. P. O'Reilly, Director U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement 101 Marietta Street, Suite 3100 Atlanta, Ga 30303

Subject:

Docket No. 50-302 Operating License No. DPR-72 I.E.Bulletin 79-10

Dear Mr. O'Reilly:

Enclosed is our response to I.E.Bulletin 79-10 dated May 11, 1979 concerning requalification training program statiscies.

Our response is in the format requested in the above ref erred bullet..n and reflects the annual examinations given to date at Crystal River Unit 3.

Please contact this office if you require any additional information.

Very truly yours, FLORIDA POWER CORPORATION c:--

b W.'} c3 t n oo-0(

W.

P.

Stewart Manager, Nuclear Operations WPSemhM02 D6 cc:

U. S. !?u-lear Regulatory Commission Office of Nuclear Reactor Regulation Division of Project Management Operator Licensing Branch Washington, D.C. 20555 File:

3-0-3-a-3 2142 052 mem 736

)

D3 General Office 320i in.rtr urtn seem soum. P O Box 14042 St Petersbu g Fiorca 33733 e 813-866 5151OY r

e

TABLE 1 e

Date: May 21, 1979 Utility:

Florida Power Corporation Facility: Crystal River Unit 3 Senior Operators Operators 1977 1978 1979 l '77 1978 1979 Exam Exam Exam Exam E xam Exam Exam Exam 1

2 3

4 1

2 3

4 See See See See Note 1 Note 2 Note ! Note 2 1.

Action 1:

Responses A-Total number failed 1

0 1

1 0

0 annual examination B.

Percent that failed

4. 5 0
2. 7
7. 7 0

0 annual examination 2.

Action 2: Responses A.

Percent required to 81.8

3. 7 13.5 84.6
7. 7 52.2 attend additional lectures B.

Number of operators 18/57 1/1 5/8 11/26 1/2 12/16 attending specified number of lectures (no. of operators /

no. of lectures 3.

Action 3: Responses A.

Total number attend-1 0

1 1

0 0

ing accelerated training lesson because 70 percent on annual written esasiaation B.

Percent attending 4.5 0

2. 7
7. 7 0

0 accelerated training lesson because 70 percent on annual written examination Not Applicable Not Applicable C.

Total number attend See Note 3 See Note 3 ing accelerated training because unsatisfactory oral e xaminat ion 2142 053 WPSenhM02 D6

1 -

Operators Senior Operators 1977 J e[8 1979 1977 1978 1979 Exam r,xam Exam Exam Exam Exam Exam Exam 1

2 3

4 1

2 3

4 3.

(Continued)

D.

Percent attending Not Applicable 1 Not Applicable accelerated train-See Note 3 See Note 3 ing because unsat-isfactory oral e xamina t ion Date of Exam 1 Sept /Oct 1977 2

Feb/ Mar 1978 3

Jan/Feb 1979 4

See Note 2 Notes:

1.

1979 Exam has just been completed.

Planned retraining resulting f rom this exam has not been completed.

2.

A fourth exam has not yet been conducted but is scheduled for early 1980.

3.

No oral examinations or walk-through examinations are given at Crystal River Unit 3.

10 CFR 55, Crystal River Unit 3 FSAR Chapter 12C, Requalification Program and AI-800 "Requal Training Program" do not require oral exams as part of their requalification program.

WPSenhM02 2142 054 D6