ML19269E393

From kanterella
Jump to navigation Jump to search
Forwards LER 79-028/03L-0
Date released: 10/10/2019 Download: ML19269E393


LER 79-028/03L-0 on 790524:redundant Low Level HPCI Start Signal from LSL-2-3-72C Found Inoperable.Caused by Human Error.Field Wiring & Connection Drawing Were Corrected & Investigation of Event Is Being Performed by Engineering QA
ML19269E395
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/22/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19269E395 (1)
Forwards LER 79-028/03L-0
ML19269E392
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/22/1979
From: Cooney M
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19269E392 (2)