Forwards Response to Item 13 Per Revision 1 of IE Bulletin 79-06A.Only Tech Spec & Design Change Necessary Is Mod to Pressurizer Safety Injection Logic
ML19269E307
Person / Time
Site: Beaver Valley
Issue date: 05/17/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-79-06A, IEB-79-6A, TAC-11685, NUDOCS 7906270196
Download: ML19269E307 (2)


Text

. .

."-[ & ff 3Rnu

'Af

($12) 471-4300 435 Sixth Avenue Pittsburgh, Pennsylvania May 17, 1979 United States Nuclear Regulatory Commission Attention: B. H. Grier, Director Region I 631 Park Avenue King of Prussia, Pennsylvanic. 19406

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 License No. DPR-66 Response to IE Bulletin 79-06A Gentlemen:

Our previous submittals regarding IE Bulletin 79-06A, dated April 30 and May 14, 1979, addressed Items 1 through 12. Attached is the response to Item 13 per Revision 1 of IE Bulletin 79-06A dated April 18, 1979.

If you have any questions regarding this response, please contact my office.

Very truly yours, Ol/i_

C. N. 7unn Vice President, Operations Attachment cc: United States Nuclear Regulatory Commission Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D. C. 20555 7900270l%

2134 002

DUQUESNL LIGHT COMPANY Beaver Valley Power Station Unit No. 1 RESPONSE TO IE BULLETIN NO.79-06A Letter Dated April 18, 1979 Item 13 Propose changes, as required, to those technical specifications which must be modified as a result of your implementing the above items and identify design changes necessary in order to effect long term resolutions of these items.

Response 13 The only technical specification and design change necessary to effect long term resolution of the items expressed in IE Bulletin 79-06A is a modification to the pressurizer safety injection logic. This modification would delete the level coincidence and alter the pressure coincidence to a 2 out of 3 low pressure logic.

The design change and technical specification change requests are presently being routed through normal company channels for implementation and submittal to the Commission.

2134 003