ML19269E119
| ML19269E119 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 04/16/1979 |
| From: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19269E120 | List: |
| References | |
| NUDOCS 7906260546 | |
| Download: ML19269E119 (2) | |
See also: IR 05000245/1979004
Text
j# *%,
UNITED STATES
A
&
NUCLEAR REGULATORY COMMISSION
.
REGION I
e
1 g
631 PARK AVENUE
KING OF PRUS$1A. PENNSYLVANI A 19406
16 APR 1979
Docket Nos. 50-245
50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Combined Inspection 50-245/79-04; 50-336/79-02
This refers to the inspection conducted by Mr. T. Shedlosky of this
office on February 10 - March 16,1979 at the Millstone Nuclear Power
Stacion, Waterford, Connecticut, of activities authorized by NRC License
Nos. DPR-21 and DPR-65 and to the discussions af our findings held by
Mr. Shedlosky with Mr. J. Opeka of your staff at the conclu-ion of the
inspection.
Areas examined during this inspection are described in the Office of
.
Inspection and Enforcement Inspection Report which is enclosed with this
letter. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, measurements made by the inspector, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were
observed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part
2, Title 10, Code of Federal Regulations, a copy of this Stter and the
enclosed inspection report will be placed in the NRC's Puolic Document
Room.
If this report contains any information that you (or your con-
tractor) believe to be proprietary, it is necessary that you make a
written application within 20 days to this office to withhold such
information from public disclosure.
Any such application must be
accompanied by an affidavit executed by the owner of the infonnation,
which identifies the document or part sought to be withheld, and
2133 318
79 62607 % 9
0
4*
Northeast Nuclear Energy
H APR 1979
2
Company
which contains a statement of reasons which addresses with specificity
the items which will be considered by the Commission as listed in
subparagraph (b)(4) of Section 2.790.
The information sought to be
withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public
Document Room.
No reply to this letter is required; however, if you should have any
questions concerning this inspection, we will be pleased to discuss
-
them with you.
Sincerely,
N
E
n J. Brunner, Chief
R ctor Operations and Nuclear
support Branch
Enclosure:
Office of Inspection and Enforcement Inspection
,
Report Number 50-245/79-04; 50-336/79-02
cc w/ encl:
J. F. Opeka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
A. Z. Roisman, Natural Resources Defense Council (Without Report)
.
2133 319