Forwards IE Insp Repts 50-245/79-04 & 50-336/79-02 on 790210-0316.No Noncompliance Noted
ML19269E119
Person / Time
Site: Millstone  
Issue date: 04/16/1979
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML19269E120 List:
References
NUDOCS 7906260546
Download: ML19269E119 (2)


See also: IR 05000245/1979004

Text

IA

j# *%,

UNITED STATES

A

&

NUCLEAR REGULATORY COMMISSION

.

REGION I

e

1 g

631 PARK AVENUE

KING OF PRUS$1A. PENNSYLVANI A 19406

16 APR 1979

Docket Nos. 50-245

50-336

Northeast Nuclear Energy Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: Combined Inspection 50-245/79-04; 50-336/79-02

This refers to the inspection conducted by Mr. T. Shedlosky of this

office on February 10 - March 16,1979 at the Millstone Nuclear Power

Stacion, Waterford, Connecticut, of activities authorized by NRC License

Nos. DPR-21 and DPR-65 and to the discussions af our findings held by

Mr. Shedlosky with Mr. J. Opeka of your staff at the conclu-ion of the

inspection.

Areas examined during this inspection are described in the Office of

.

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, measurements made by the inspector, and observations by the

inspector.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part

2, Title 10, Code of Federal Regulations, a copy of this Stter and the

enclosed inspection report will be placed in the NRC's Puolic Document

Room.

If this report contains any information that you (or your con-

tractor) believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the infonnation,

which identifies the document or part sought to be withheld, and

2133 318

79 62607 % 9

0

4*

Northeast Nuclear Energy

H APR 1979

2

Company

which contains a statement of reasons which addresses with specificity

the items which will be considered by the Commission as listed in

subparagraph (b)(4) of Section 2.790.

The information sought to be

withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public

Document Room.

No reply to this letter is required; however, if you should have any

questions concerning this inspection, we will be pleased to discuss

-

them with you.

Sincerely,

N

E

n J. Brunner, Chief

R ctor Operations and Nuclear

support Branch

Enclosure:

Office of Inspection and Enforcement Inspection

,

Report Number 50-245/79-04; 50-336/79-02

cc w/ encl:

J. F. Opeka, Station Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Himmelwright, Licensing Safeguards Engineer

A. Z. Roisman, Natural Resources Defense Council (Without Report)

.

2133 319