Forwards IE Insp Repts 50-295/79-02 & 50-304/79-02 on 790306-07 & 27-28.No Noncompliance Noted
ML19269D435
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/11/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19269D436 List:
References
NUDOCS 7906040045
Download: ML19269D435 (2)


See also: IR 05000295/1979002

Text

T

'

TIC

., .

" " " %

UNITED STATES

,

.t

NUCLEAR REGULATORY COMMF,SION

f,',

j

REGION lif

j

799 RJOSE VE LT ROAD

-4 e

G LE N E LL Y N. ILLINotS 60137

  • "**

APR 111979

Docket No. 50-295

Docket No. 50-304

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL

60690

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this

office on March 6-7, and 27-28, 1979, of activities at Zion Nuclear

Power Station, Units 1 and 2, authorized by NRC Operating Licenses

No. DPR-39 and No. DPR-48 and to the discussion of our findings with

Mr. N. E. Wandke and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The

application must include a full statement of the reasons for

which the informatior is considered proprietary, and should be

prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

79060400'(f

.

APR 111979

e

Commonwealth Edison Company - 2 -

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

f.0$

.

Gaston Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Reports No. 50-295/79-02

and No. 50-304/79-02

cc w/ encl:

N. Wandke, Plant Superintendent

Central Files