ML19269C990

From kanterella
Jump to navigation Jump to search
Forwards IE Info Bulletin 79-02, Attempted Extortion - Low Enriched U
ML19269C990
Person / Time
Site: 07000036
Issue date: 02/02/1979
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Lichtenberger H
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
NUDOCS 7902260100
Download: ML19269C990 (1)


Text

-

n YK' l" I UNIT ED STATES

.g#

4, NUC LE AR REGULATORY COMMISSION f,.

4 REGION lit f(",.

TActD

( '$

y 7f9 ROoSE V E L

~

4[

G LE N E LL* N itRNC:S 50?37 FEB 2

.379 Docket No. 70-36 Combustion Engineerit.g, Inc.

ATTN:

Mr. H. V. Lichtenberger Vice President - Manufacturing Nuclear Power Systems Windsor, CT 06095

/

Gentlemen:

The enclosed Inf ormation Notice No. 79-02 is forwarded to you u

for information. No specific action is requested and no written response in required. If you desire additional information regard-ing this matter, please contact this of fice.

Sincerely, O k A --

L amesG.Kelpier Director

Enclosures:

1. IE Information Notice "o. 79-02
2. List of IE Information Notices Issued in 1979 cc w/ encl:

Mr. J. A. Rode, Plant Manager Central Files Director, NRR/DPM Director, NRR/ DOR PDR NSIC 7902260\\00

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT REGION III February 2,1979 IE Information Notice No. 79-02 ATTEMPTED EXIORTION - LOW ENRICHED URANILH Description of Circunstances:

This notice provides infor=ation concerning an alleged theft of low-enriched uranium from the General Electric plant in Wilmington, North Carolina.

On Monday, January 29, 1979, the plant manager received a letter demanding

$100,000 for the return of the material purported to be stolen and which set a deadline of February 1,1979, for delivery of the coney. During the course of the week, the FBI conducted an intensive investigation leading to the arrest on February 1, 1979, of a temporary e=ployee of a General Electric subcontractor.

Also on February 1, the material was recovered and returned to the plant.

Inquiries are continuing in an effort to determine the cethod used by the individual to remove the material from the plant.

This event could possibly provoke similar behavior on the part of other persons. Consequently, you should be aware of such an eventuality and take steps to deal with it, should it occur. NRC is not placing additional requirements on you, but is advising that extra caution be exercised in your existing security program.

No action is requested of you and no written response to this Information Notice is required.

If you desire additional infor=ation regarding this matter, contact the Director of the appropriate NRC Regional Office.

If you have any further questions, please feel free to contact this office.

IE Infor=ation Notice No. 79-02 February 2, 1979 LISTING OF IE INFORMATION NOTICES ISSUED IN 1979 Information Subject Date Issued To Notice No.

Issued 79-01 '

Bergen-Paterson Hydraulic 2/2/79 All power reactor Shock and Sway Arrestor facilities with an OL or a CP O

d