(412) 471-4200 435 5;cn Avenue urgn. Pennsylvama DUQUESNE LIGHT CCMPANY 3eaver Valley Power Station Post Office Box 4 Shippingport, PA 15077 February 2, 1979 BVPS :R01: 735 Beaver Valley Power Station Amended Physical Security Plan Mr. Michael J. Gaitanis Office of Nuclear Reactor Regulation Reactor Safeguards Licensing Branch United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Gaitanis:
Attached for your review and co==ent are draft revisions to the amended Physical Security Plan which will hopefully meet with NRC concurrence.
This and future submittals will consist of the following:
1.
The Physical Security Plan The plan indicates our preferred methods for meeting the a.
requirements of 10 CFR 73.55.
b.
Some of these methods will be implemented by Feoruary 23, 1979 and some will not.
2.
A Supplement to the Physical Security Plan a.
Where the methods described in the plan will not be implemented by the February deadline, the supplement describes interim measures which will be taken to meet the requirements of 10 CFR 73.55 b.
As the preferred methods are implacented, you will be notified and the appropriate portions of the supplement will be deleted.
1ff; ad a *l~f ke.f7 7902060 209
Mr. Michael J. Gaitanis February 2, 1979 3VPS:WMM:735 Page 2 3.
A Physical Security Plan Implementation Matrix This matrix identifies those portions of the plan or a.
supplement currently in effect.
b.
Also included in the matrix are projected implementation dates for the preferred methods.
Additional submittals will be forthcoming in the very near future.
Very truly yours,
-jt.yr1. % t, LEO W. M. Shrq ardt Station Office Manager Attachments