ML19269C289

From kanterella
Jump to navigation Jump to search
Forwards LER 79-001/03L-0
Date released: 10/10/2019 Download: ML19269C289


LER 79-001/03L-0 on 790101:during Operating Daily Surveillance Log Survey (SP-300),noted That Pressure in B Core Flood Tank Was 630 Psi.Caused by Operator Error During Repressurization
ML19269C291
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/24/1979
From: Cooper J
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19269C291 (2)
Forwards LER 79-001/03L-0
ML19269C288
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/25/1979
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19269C288 (1)