ML19269C176
| ML19269C176 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/09/1979 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | |
| Shared Package | |
| ML17317A908 | List: |
| References | |
| 50-316-78-35, NUDOCS 7901290272 | |
| Download: ML19269C176 (1) | |
Text
.
Appendix A NOTICE OF VIOLATIO,N Decket No. 50-316 American Electric Power Service Corporatioh gr Indiana and Michigan -
Power Company Based on the inspection conducted on November 29-December 1, 1978, it appears that certain of your activities were not conducted in This full compliance with NRC requirements as indicated below.
item is categorized aa a deficiency.
70.53 requires that each licensee who is authorized to 10 CFR Part possess at any one time and location special nuclear material in a quantity totaling more than 350 grams of contained uranium 235, uranium 233 or plutonium or any combination thereof, shall complete and submit to the Commission Material Status Report on Form NRC-742, in accordance with printed instructions for completing the form, concerning special nuclear material received, produced, possessed, All transferred, consumed, disposed of or lost by the licensee.
such reports shall be made as of March 31 and September 30 of each year.
Contrary to the printed instructions for the completion of Form NRC-742, the subschedule for receipt activity for the period October 1,1977, to March 31, 1978, did not show correct transfer corrections involving adjustments to receipts series numbers in that shown and the quantity reported received on the subschedule were not was not the same as reflected on line 30 of the Form NRC-742 for the six month period being reported.
In addition, 13 corrected Forms NRC-741 dated April 6, 1978 were erroneously inc'.uded for activity being reported as of March 31, 1978 instead of the report period, April 1, 1976 to September 30, 1978 as required.
790129oa7P