Per Finding During Containment Integrated Leak Rate Test,Nrc Recommends Review of Design of Containment Liner Plate Weld Channel Boxes So That Containment Boundary Can Be Leak Tested
ML19269C040
Person / Time
Site: Green County Power Authority of the State of New York icon.png
Issue date: 01/10/1979
From: Baer R
Office of Nuclear Reactor Regulation
To: Berry G
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 7901190232
Download: ML19269C040 (5)


Text

'

m 3

8 b

UNITED STATES

[ v.

, ?*4 NUCLEAR REGULATORY COMMisslON 3 +.'

j I

WASHINGTON. D. C. 20555

's Y b f l JAN 101979 Docket No. 50-549 Mr. George T. Berry General Manager & Chief Engineer Power Authority of the State of New York 10 Columbus Circle New York, New York 10019

Dear Mr. Berry:

SUBJECT:

RECEhT STAFF EXPERIENCE WITH A CONTAINMENT INTEGRATED LEAK RATE TEST During a recent containment integrated leak rate test (CILRT) at the Beaver Valley Power Station, Unit 1, the inspector found that the containtrent liner plate weld channel boxes were not vented for the test.

It had been our position that such channel boxes must be vented during a CILRT to ensure that the liner plate welds are included in the test.

We are now in the process of further defining our position regarding channel boxes to account for potential technological problems associated with venting these boxes.

These problems include potential condensation and corrosion of the liner and welds inside of the weld boxes, and in some containment designs the question of qualifying or replacing channel box test connections that penetrate the liner wall.

We note that Stone & Webster, who is also the architect / engineer for the Beaver Valley Power Plant, has included a similar liner plate weld channel box design in the Greene County Nuclear Power Plant. We recommena tnat you review the design of these channel boxes in the light of the above potential technological problems so that the containment boundary can be leak tested according to Appendix J to 10 CFR Part 50. This matter will be reviewed in detail at the operating license stage.

Please call us if you have questions concerning this matter.

Sincerely,

/

e f ' '-,%

Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management ccs: See next pages 7901190 $ R

Mr. George T. Berry JAN 1 0 G79 General Manager & Chief Engineer Power Authority of the State of New York 10 Columbus Circle New York, New York 10019

.c: Admiral P. J. Early Power Authority of the State of New York 10 Columbus Cir:le New York, New York 10019 Mr. Andrew W. Barchas Project Engineer Power ^uthority of the State of New York 10 Columbus Circle New York, New York 10019 Director, Technical Development Programs State of New York Energy Office Agency Building 2 Empire State Plaza Albany, New York 12223 Gregory F. Golgowski Planning Aide Columbia County Environmental Management Council 247 Warren Street Hudson, New York 12534 Mr. W. C. Gruenberg, J r.,

Project Engineer Stone & Webster Engineering Corporation Post Offica Box 1350 New York, New York 10001 Mr. S. F. Hellman, Project Manager Babcock & Wilcox Company Post Office box 1260 Lynchburg, Virginia 24505 Mr. P. W. Lyon Manager-Nuclear Operations Power Authority of the State of New Yo.(

10 Columous Circle New York, New York 10019

II Mr. George T. Berry cc: Algird F. White, Jr.

DeGraff, Foy, Conway and Holt-Harris Attorneys and Counselors at Law Ninety State Street Albany, New York 12207 Jeff rey C. Cohen, Esq.

New York State Energy Office Swan Street Building Core 1 - 2nd Floor Empire State Plaza Albany, New York 12223 Arthur Rheingold, Esq.

Assistant General Counsel Mark S. Kahan, Esq.

Staff Counsel State of New York Public Service Commission Empire State Plaza Albany, New York 12223 Lewis R. Bennett, Esq.

Assistant General Manager - General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Vito J. Cassan, Esq.

Assistant General Counsel Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Edward R. Patrick, Esq.

Assistant Counsel for Energy NYS Department of Env r onmental i

Conservation Room 608 - 50 Wolf Road Albany, New York 12233

JAN 1 0 M79 Mr. George T. Berry cc: Mid-Hud' son Nuclear 00nonents P. O. Box 666 New Paltz New York Ms. Rosemary S. Pooler Executive Director New York State Consumer Protection Board 99 Washington Avenue Albany, New York 12210 Columbia County Survival Committee P. O. Box 27 Germantown, New York 12526 Citizens to Preserve the Hudson Valley Miller, Mannix, Lemery & Kafin, P. C.

11 Chester Street Glens Falls, New York 12801 Albert K. Butzel, Esq.

Butzel & Kass 45 Rockefeller Plaza, Suite 2350 New York, New York 10020 Edward W. Hyland, Vice President General Counsel and Secretary Lehigh Portland Cement Company 718 Hamilton Mall Allentown, Pennsylvania 18105 William J. Spampinato, Esq.

Rosenberg & Spampinato 443 Warren Street Hudson, New York 12534 Arthur L. Reuter, Esq.

Attorney at Law Sharpe's Landing Germantown, New York 12526 Mr. John Nickolitch Cementon Civic Association

' P. O. Box 124 Cementon, New York 12415

Mr. George T. Berry jou1 0 %R9 cc: Nancy Spiegel, Esq.

NYS Public Service Connission Agency Building 3 Empire State Plaza Albany, New York 12223 Andrew C. Goodhope, Esq., Chairman Atomic Safety and Licensing Board 3320 Estelle Terrace Wheaton, Maryland 20906 n. Richard F. Cole r

Atomic Safety and Licensing Board U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. George A. Ferguson Professor of Nuclear Engineering Howard University Washington, D. c.

20666

%