g># AIGL,
UNITED sT ATEt
o,
NUCLE AR REGULATORY COMMISSION
g, ,g"-[
REGloN li
-
.$ff/
,. g/[ ,g
3
E
101 M ARIETT A sTRE ET. N.W
' g
,
- Jf
3*k,Q4!
e'z
.,'
.
.
DEC 121978
.
.....
In Reply Refer To:
RII:CRM
50-338/78-39
50-339/78-33
50-404/78-9
50-405/78-9
.
Virginia Electric and Power Company
Attn:
Mr. W. L. Proffitt
Senior Vice President,
Power
P. O. Box 26666
Richmond, Virginia
23261
Gentlemen:
.
This refers to the inspection conducted by Mr. C. R. McFarland of this
offie on November 13-17, 1978, of activities authorized by NRC License
No. NPF-4 and Construction Permit Nos. CPPR-78, CPPR-ll4 and CPPR-115
for the North Anna Power Station Units 1, 2, 3 and 4 facilities, and to
the discussion of our findings held with Mr. J. L. Perkins at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the h7C's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
79011900 N
g
.
DEC 121978
.
Virginia Electric and Power Co.
-2-
.
.
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared
so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear
from you in this regard within the specified period, the report
will be placed in the Public Document Room.
.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
Sincerely,
c"?
&
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enc 1csure:
Inspection Report Nos.
50-338/78-39, 50-339/78-33,
50-404/78-9 and 50-405/78-9
cc w/ encl:
Mr. W. R. Cartwright, Station Manager
North Anna Power Station
P. O. Box 402
Mineral, Virginia 23117
Mr. P. M. Perry, Senior Resident Engineer
P. O. Box 38
Mineral Virginia
23117