ML19268A134
From kanterella
Jump to navigation
Jump to search
ML19268A134 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 09/11/2019 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML19269C528 | List: |
References | |
W3F1-2019-0064 | |
Download: ML19268A134 (31) | |
Similar Documents at Waterford | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML20258A0882019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML19268A1412019-09-11011 September 2019 11 to Final Safety Analysis Report, Table of Contents ML20258A0922019-09-11011 September 2019 11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML19268A1372019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 17 - Quality Assurance ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted ML19268A1482019-09-11011 September 2019 11 to Final Safety Analysis Report, EC Markups July 2019 ML20258A0872019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML19268A1302019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 09 - Auxiliary Systems ML19268A1352019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 14 - Initial Test Program ML19268A1362019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 15 - Accident Analyses ML19268A1492019-09-11011 September 2019 11 to Final Safety Analysis Report, Instructions ML19268A1342019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 13 - Organizational Structure ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML19268A1282019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 07 - Instrumentation and Controls W3F1-2019-0064, Submittal of Revision 311 to Final Safety Analysis Report2019-09-11011 September 2019 Submittal of Revision 311 to Final Safety Analysis Report ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML18229A1782018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML18229A1832018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 13, Organization Structure ML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML18229A1752018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls W3F1-2017-0078, Final Safety Analysis Report, Revision 3102017-12-0606 December 2017 Final Safety Analysis Report, Revision 310 ML16256A4812016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Table of Contents ML16257A0982016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.6 ML16257A0992016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.7 ML16257A1412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A ML16257A0942016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.2 ML16257A0962016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.4 ML16256A4332016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 8, Table of Contents ML16256A1822016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C - Bend Force Calculation in a Piping System Using CALPLOTF2421 ML16256A1932016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design ML16256A2832016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2B ML16256A1282016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.6 ML16257A1442016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2 ML16256A1382016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.9, Figures 1.93 Through 1.94 ML16256A1742016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.3 ML16256A3322016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Section 7.8 ML16257A1002016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Appendix 13A ML16256A1272016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.4 ML16256A4902016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A, Figure 10.4.9A-1 ML16256A2412016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Appendix 5.2B, Figures 5.2B-1 Through 5.2B-3 ML16256A3262016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Appendix 7.7A ML16257A1512016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix D, Figures 15D.2-1 Through 15D.2-7 ML16256A1232016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.0 ML16256A2702016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Section 6.0 ML16256A2762016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2C ML16256A1362016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.5 ML16256A1972016-08-25025 August 2016 Revision 309 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.7A - Sesmic Design - Parametric Studies 2019-09-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19268A134&oldid=4854520"