ML19268A131
From kanterella
Jump to navigation
Jump to search
ML19268A131 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 09/11/2019 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML19269C528 | List: |
References | |
W3F1-2019-0064 | |
Download: ML19268A131 (246) | |
Similar Documents at Waterford | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML20258A0922019-09-11011 September 2019
[Table view]11 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML19268A1252019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 04 - Reactor ML19268A1492019-09-11011 September 2019 11 to Final Safety Analysis Report, Instructions ML19268A1412019-09-11011 September 2019 11 to Final Safety Analysis Report, Table of Contents ML19268A1482019-09-11011 September 2019 11 to Final Safety Analysis Report, EC Markups July 2019 W3F1-2019-0064, Submittal of Revision 311 to Final Safety Analysis Report2019-09-11011 September 2019 Submittal of Revision 311 to Final Safety Analysis Report ML20258A0872019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML19268A1282019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 07 - Instrumentation and Controls ML19268A1342019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 13 - Organizational Structure ML19268A1312019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 10 - Steam and Power Conversion System ML20258A0882019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML19268A1232019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 18 - Aging Management Programs and Activities ML19268A1292019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 08 - Electric Power ML19268A1352019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 14 - Initial Test Program ML19268A1302019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 09 - Auxiliary Systems ML20258A0912019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML20258A0712019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted ML19268A1362019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 15 - Accident Analyses ML19268A1372019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 17 - Quality Assurance ML19268A1322019-09-11011 September 2019 11 to Final Safety Analysis Report, Chapter 11 - Radioactive Waste Management ML18229A1782018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML20255A2182018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted ML20255A2532018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted ML18229A1832018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 13, Organization Structure ML18229A1892018-07-25025 July 2018 10 to Final Safety Analysis Report, List of Effective Pages, Final W3F1-2018-0041, 10 to Final Safety Analysis Report, Table of Contents2018-07-25025 July 2018 10 to Final Safety Analysis Report, Table of Contents ML18229A1722018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 4, Reactor ML18229A1852018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 15, Accident Analyses ML20255A2392018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted ML18229A1862018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML18229A1772018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML18229A1762018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 8, Electric Power ML20255A2572018-07-25025 July 2018 10 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted ML18229A1752018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML18229A1802018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20255A2422018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted ML18229A1842018-07-25025 July 2018 10 to Final Safety Analysis Report, Chapter 14, Initial Test Program W3F1-2017-0078, Final Safety Analysis Report, Revision 3102017-12-0606 December 2017 Final Safety Analysis Report, Revision 310 ML16257A1512016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix D, Figures 15D.2-1 Through 15D.2-7 ML16256A1272016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.4 ML16256A4902016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System, Section 10.4.9A, Figure 10.4.9A-1 ML16257A1442016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 15, Accident Analyses, Appendix 15A, Figures 15A.3-1 Through 5A.3-2 ML16256A3262016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Appendix 7.7A ML16256A2832016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Appendix 6.2B ML16256A1932016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.4 - Water Level (Flood) Design ML16256A1822016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Appendix 3.6C - Bend Force Calculation in a Piping System Using CALPLOTF2421 ML16256A4332016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 8, Table of Contents ML16256A1922016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components Equipment and Systems, Section 3.10 - Seismic Qualifications of Seismic Category 1 Instrumentation & Electrical Equipment ML16257A0942016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 13, Organizational Structure, Section 13.2 ML16256A1232016-08-25025 August 2016 09 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant, Section 1.0 2019-09-11 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML19268A131&oldid=4854522"