National Institute of Standards and Technology - Non-Acceptance of Amendment Request with Opportunity to Supplement, for the Renewed Facility License No. TR-5
ML19267A135
Person / Time
Site: National Bureau of Standards Reactor
Issue date: 10/02/2019
From: Xiaosong Yin
Research and Test Reactors Licensing Projects Branch
To: Dimeo R
US Dept of Commerce, National Institute of Standards & Technology (NIST)
Yin X, NRR/DLP, 415-1404
References
EPID L-2019-LLA-0193
Download: ML19267A135 (5)


Text

October 2, 2019 Dr. Robert Dimeo, Director NIST Center for Neutron Research National Institute of Standards and Technology U.S. Department of Commerce 100 Bureau Drive Mail Stop 8561 Gaithersburg, MD 20899-8561

SUBJECT:

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY -

NON-ACCEPTANCE OF AMENDMENT REQUEST WITH OPPORTUNITY TO SUPPLEMENT, FOR THE RENEWED FACILITY LICENSE NO. TR-5 (EPID: L-2019-LLA-0193)

Dear Dr. Dimeo By letter dated July 5, 2019 (Agencywide Documents Access and Management System Accession No. ML19197A045), the National Institute of Standards and Technology (NIST) submitted a license amendment request (LAR or application) for the NIST Center for Neutron Research Test Reactor. The proposed LAR would modify the NIST license conditions regarding its physical security plan.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the LAR has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the facility.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original application.

Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff requests that you supplement the application to address the information requested in the enclosure within thirty (30) days from the date of this letter. This will enable the NRC staff to begin its detailed technical review. If the information responsive to the NRC staff request is not received by the above date, the application will not be accepted for review pursuant to 10 CFR 2.101, and the NRC staff will cease its review activities associated with the application. If the application is subsequently accepted for review, you will be advised of any further information needed to support the NRC staff detailed technical review by separate correspondent.

R. Dimeo The information requested and associated time frame in this letter were discussed with Dr. Thomas Newton of your staff on September 16, 2019.

If you have any questions, please contact me at (301) 415-1404, or by electronic mail at Xiaosong.Yin@nrc.gov.

Sincerely,

/RA/

Xiaosong Yin, Project Manager Research and Test Reactors Licensing Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 50-184 License No. TR-5

Enclosure:

As stated cc: w/enclosure: See next page

National Institute of Standards and Technology Docket No. 50-184 cc:

Environmental Program Manager III Radiological Health Program Air & Radiation Management Adm.

Maryland Dept of the Environment 1800 Washington Blvd, Suite 750 Baltimore, MD 21230-1724 Director, Department of State Planning 301 West Preston Street Baltimore, MD 21201 Director, Air & Radiation Management Adm.

Maryland Dept of the Environment 1800 Washington Blvd, Suite 710 Baltimore, MD 21230 Director, Department of Natural Resources Power Plant Siting Program Energy and Coastal Zone Administration Tawes State Office Building Annapolis, MD 21401 President Montgomery County Council 100 Maryland Avenue Rockville, MD 20850 Test, Research and Training Reactor Newsletter Attention: Ms. Amber Johnson Dept of Materials Science and Engineering University of Maryland 4418 Stadium Drive College Park, MD 20742-2115 Dr. Thomas H. Newton, Deputy Director National Institute of Standards and Technology NIST Center for Neutron Research U.S. Department of Commerce 100 Bureau Drive, Mail Stop 6101 Gaithersburg, MD 20899-6101

ML19267A135 NRR-058 OFFICE NRR/DLP/PRLB/PM NRR/DLP/PROB NRR/DLP/PRLB/LA* NRR/DLP/PRLB/BC NRR/DLP/PRLB/PM NAME XYin EReed NParker GCasto XYin DATE 10/01/2019 10/01/2019 9/26/2019 10/02/2019 10/02/2019 OFFICE OF NUCLEAR REACTOR REGULATION SUPPLEMENTAL INFORMATION NEEDED FOR LICENSE AMENDMENT REQUEST NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY LICENSE NO. TR-5; DOCKET NO. 50-184

1) Provide a full updated and most current version of the National Institute of Standards and Technology facility physical security plan with all the attachments.

Enclosure