ML19263F385
| ML19263F385 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/27/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19263F382 | List: |
| References | |
| NUDOCS 8001280062 | |
| Download: ML19263F385 (2) | |
See also: IR 05000424/1979018
Text
.
.
!
o
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
)
o
$
E
REGION 11
h
0,
101 MARIETTA ST., N.W., SUITE 3100
%*****o
ATLANTA, GEORGIA 30303
DEC 2 7 tg79
In Reply Refer To:
RII:JRH
50-424/79-18
50-425/79-18
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by J. R. Harris of this office on
December 4-6, 1979 of activities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, and to the
discussion of our findings held with K. Gillespie at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection cinsisted of
selective examinations of procedures and representative records, :.nterviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the Lasis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.
e
1817
083
8o01280
062
.
.
.
Georgia Power Company
-2-
DEC 2 71979
.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
y
.
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-424/79-18
and 50-425/79-18
cc w/ encl:
K. M. Gillespie,
Construction Project Manager
P. O. Box 282
Waynesboro, GA 30830
E. D. Groover
QA Site Supervisor
P. O. Box 282
Waynesboro, GA 30830
D. E. Dutton
Proje:t General Manager
Georgia Power Company
Post Office Box 4545
Atlanta, GA 30303
.
1817
084