o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

)

o

$

E

REGION 11

h

0,

101 MARIETTA ST., N.W., SUITE 3100

%*****o

ATLANTA, GEORGIA 30303

DEC 2 7 tg79

In Reply Refer To:

RII:JRH

50-424/79-18

50-425/79-18

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on

December 4-6, 1979 of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Vogtle Nuclear Plant facility, and to the

discussion of our findings held with K. Gillespie at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection cinsisted of

selective examinations of procedures and representative records, :.nterviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the Lasis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

e

1817

083

8o01280

062

.

.

.

Georgia Power Company

-2-

DEC 2 71979

.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

y

.

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-424/79-18

and 50-425/79-18

cc w/ encl:

K. M. Gillespie,

Construction Project Manager

P. O. Box 282

Waynesboro, GA 30830

E. D. Groover

QA Site Supervisor

P. O. Box 282

Waynesboro, GA 30830

D. E. Dutton

Proje:t General Manager

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

.