I Vinoin A Et.zcTate Ann Powna COMPANY R s cu x on n.Va motm1A sones
- +.,,, % %
4} * ~
April 19, 1979 Mr. James P. O'Reilly, Director Serial No.
232 Office of Inspection and Enforcement P0/FHT:sej U. S. Nuclear Regulatory Commission Docket No.
50-281 Region 11 101 Mariett a Street, Suite 3100 Atlant a, Georgia 30303 License No.
Dear Mr. O'Reilly:
We have reviewed your letter of March 30, 1979, in reference to the inspection conducted at Surry Power Station Unit No. 2 on March 6-9, 1979, and reported in I.E. Inspection Report No. 50-281/79-14 Our response to the specific deviation is attached.
We have determined that no proprietary information is cont ained in the report.
Accordingly, Virginia Electric and Power Company has no objection to this inspection report being made a matter of public disclosure.
Very truly yours, SSs t ' <, )
.i C. M.
Stallings Vice President-Power Supply and Production Operations At t ar r. ment cc:
Mr. Albert S chwe nc e r 2218 321 f?cr98-7906250l30 S ' -t.1 ia
RESPONSE TO VIOLATION NOTED IN IE INSPECTION REPORT NO. 50-281/79-14 A.
NRC Comment:
As required by 10 CFR, Part 50, Appendix B, Criterion XVII, as implemented by VEPCO's licensing submittal (Steam Generator Project, S stry Power Station Unit s Nos. I and 2 - Revision 9),
" Sufficient records shall be maintained to furnish evidence of act ivities af fecting quality...
Inspection and test records shc11, as a minimum, identify the inspector or data recorder, the type of observation, the results, the acceptability, and the action taken in connection with any deficiencies noted.
Records shall be identifiable and retrievable". West inghouse Process Specifications NPT-91 and 94 require that the monitoring schedules for nitrogen pressure gage readings of primary and secondary sides of the steam generator lower assemblies shall be documented.
Contrary to the above, on March 8,1979, the S.G. Lower assemblies identified as #2927, #2973 and #2981 had no official records for nitrogen pressure gage readings.
Response
The item is correct as stated.
The records for nitrogen pressure ge e readings were informal.
1.
Corrective steps which have been taken and results achieved:
Formal documentation was instituted on March 10, 1979.
Inspection and test records are being maintained in accordance with Westinghouse NPT 91, 94 and VEPCO Quality Assurance procedures.
2.
Corrective steps taken to avoid further non-compliance:
The action taken above will preclude further non-compliance.
3.
The date when full compliance will be achieved:
Full compliance was achieved on March 10, 1979.
2218 322