ML19263E411
| ML19263E411 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 04/02/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML19263E410 | List: |
| References | |
| NUDOCS 7906180090 | |
| Download: ML19263E411 (2) | |
See also: IR 05000424/1979004
Text
e
.
e
UNITED STATES
paarCoq
-%
[p
jo
NUCLEAR REGULATORY COMMISSION
g
REGION n
,
2
.p3
g
101 M ARIETT A STR E ET, N.W.
f
'-"
r
8
AT L ANT A. GEORGI A 30303
s,...../
o,
02 M
In Reply Refer To:
Rll:MDH
l
50-424/79-4
50-425/79-4
Georgia Power Company
ATTN:
J. H. Miller, Jr.
Executive Vice President
270 Peachtree Street
Atlanta, GA 30303
Gentlemen:
This refers to the inspection conducted by M. D. Hunt of this office on
March 6-8, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-108 and CPPR-109 for the Alvin W. Vogtle Nuclear Plant Units 1 and 2
facility, and to the discussion of our findings held with H. H. Gregory, III
at the conclusion of the inspection.
Areas examined during the inspection and our findings are d.scussed in the
Within these areas, the inspection consisted of
enclosed inspection report.
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is
discussed in the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
wilI be placed in the NRC's Public Docum 7t Room.
If this
inspection report
contains any information that you (or your contractor) believe to be
report
is necessary that you make a written application within
proprietary, it
20 days to this office to withhold such information from public disclosure
Any such application must include a full statement of the reasons on the
basis of which it ir claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
2355 260
oN
9
79081so
,
.
.
.
fpR 0 21973
.
Georgia Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
.
'
Sincerely,
h'
Charles E. M'urphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosure:
Inspection Report Nos. 50-424/79-4
and 50-425/79-4
cc w/ encl:
K. M. Gillespie,
Construction Project Man:ger
P. O. Box 282
Waynesboro, GA 30830
E. D. Grover
QA Site Supervisor
P. O. Box 282
Waynesboro, GA 30830
2355
261