Forwards IE Insp Repts 50-424/79-04 & 50-425/79-04 on 790306-08.No Noncompliance Noted
ML19263E411
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19263E410 List:
References
NUDOCS 7906180090
Download: ML19263E411 (2)


See also: IR 05000424/1979004

Text

e

.

e

UNITED STATES

paarCoq

-%

[p

jo

NUCLEAR REGULATORY COMMISSION

g

REGION n

,

2

.p3

g

101 M ARIETT A STR E ET, N.W.

f

'-"

r

8

AT L ANT A. GEORGI A 30303

s,...../

o,

02 M

In Reply Refer To:

Rll:MDH

l

50-424/79-4

50-425/79-4

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by M. D. Hunt of this office on

March 6-8, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-108 and CPPR-109 for the Alvin W. Vogtle Nuclear Plant Units 1 and 2

facility, and to the discussion of our findings held with H. H. Gregory, III

at the conclusion of the inspection.

Areas examined during the inspection and our findings are d.scussed in the

Within these areas, the inspection consisted of

enclosed inspection report.

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is

discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

wilI be placed in the NRC's Public Docum 7t Room.

If this

inspection report

contains any information that you (or your contractor) believe to be

report

is necessary that you make a written application within

proprietary, it

20 days to this office to withhold such information from public disclosure

Any such application must include a full statement of the reasons on the

basis of which it ir claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2355 260

oN

9

79081so

,

.

.

.

fpR 0 21973

.

Georgia Power Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

.

'

Sincerely,

h'

Charles E. M'urphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-424/79-4

and 50-425/79-4

cc w/ encl:

K. M. Gillespie,

Construction Project Man:ger

P. O. Box 282

Waynesboro, GA 30830

E. D. Grover

QA Site Supervisor

P. O. Box 282

Waynesboro, GA 30830