Forwards IE Insp Repts 50-456/79-03 & 50-457/79-03 on 790313-0315.No Noncompliance Noted
ML19263E186
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/06/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19263E187 List:
References
NUDOCS 7906050222
Download: ML19263E186 (2)


See also: IR 05000456/1979003

Text

\\

TERA

c#

4

UNITFO STATES

e

., e

  • .

NUCLEAR REGULATORY COMMISSION

f,i^

' h

REGloN 111

-

C

799 ROOSEVELT ROAD

g,

GLE N E LLY N. ILLINolS 60137

.....

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. C. E. Jones of this

office on March 13-15, 1979, of activities at Braidwood Nuclear

Power Station, Units 1 and 2, authortzed by NRC Construction Permits

No. CPPR-132 and No. CPPR-133 and to the discussion of our findings

with Mr. R. Cosaro and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the enclosed inspection report will be placed in the NRC's Public

Document Room, except as follows.

If this report contains information

that you or your contractors believe to be proprietary, you must apply

in writing to this office, within twenty days of your receipt of this

letter, to withhold such information from public disclosure.

The

application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is con-

tained in an enclosure to the application.

2300

073

7906050} N .

.

,

i

Commonwealth Edison

-2-

Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

.

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-456/79-03

and No. 50-457/79-03

cc w/ encl:

Mr. R. Cosaro, Proj ect

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR