ML19263E038

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-327/79-17 & 50-328/79-10 on 790309-12.No Noncompliance Noted
ML19263E038
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/02/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19263E039 List:
References
NUDOCS 7906010029
Download: ML19263E038 (2)


See also: IR 05000327/1979017

Text

UNITED STA rEs

g& W,

[(g* "8009[o,,

NUCLEAR REGULATORY COMMISSION

d

Mb

/

REGION ll

.p.,

g

101 M ARIETT A sT R E ET, N.W.

d

  • "

c

[

ATLANTA, GE ORGI A 30303

o

* * * . * *

APR 0 21973

.aG

In Reply Refer To:

.

RIJ:EJV

I

50-327/79-17

50-328/79-10

Tennessee Valley Authority

ATTN:

H. G. Parris

rianager of Power

500A Chestnut Street lower 11

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by E.

J. Vallish of this office on

,

riarch 9-12, 1979, of activities authorized by NRC Construction Permit Nos.

CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant l'n t t s 1 and 2 facility,

and to the discuss.on of'our findings held with C. E.

Cantrell at the con-

clusion of the inspection.

Areas examined during the inspection and our findtngs are discussed in the

enclosed inspection report

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and oriservations by the inspector

Within the scope of this inspection, no items of nuncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Ruler of Practice", Part 2,

a copy of this letter and the enclosed

Title 10, Code of lederal Regulations,

inspection repcrt .ill be placed in the NRC's Publu Document Room.

If this

report contains any information that you (or your cont ract or) believe to be

proprietary, it is necessary that you make a written application within

20 days to this of f n e to withhold such inf ormation t rom public disclosure.

Any such application must include a ful1 statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that ,coprietary information identified in the application is

contained in a separate part of the document.

It we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

2288

353

.

79060100g

.

9

APR 0 21979

,

Tennessee Valley Authority

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

'

Sincerely,

j

[

Charles E. Murphy,

ief

Reactor Construction and Engineering

Support Branch

Enclosure

Inspection Report Nos. 50-327/79-17

and 50-328/79-10

cc w/ encl:

J. E. Gilleland

Assistant Manager of Power

500C Chestnut Street Tower 11

Chattanooga, TN 37401

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

2288

,54

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10Cl31 C

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower 11

Chattanooga, TN 37401

4