ML19263E038
| ML19263E038 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/02/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19263E039 | List: |
| References | |
| NUDOCS 7906010029 | |
| Download: ML19263E038 (2) | |
See also: IR 05000327/1979017
Text
UNITED STA rEs
g& W,
[(g* "8009[o,,
NUCLEAR REGULATORY COMMISSION
d
Mb
/
REGION ll
.p.,
g
101 M ARIETT A sT R E ET, N.W.
d
- "
c
[
ATLANTA, GE ORGI A 30303
o
* * * . * *
APR 0 21973
.aG
In Reply Refer To:
.
RIJ:EJV
I
50-327/79-17
50-328/79-10
Tennessee Valley Authority
ATTN:
H. G. Parris
rianager of Power
500A Chestnut Street lower 11
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by E.
J. Vallish of this office on
,
riarch 9-12, 1979, of activities authorized by NRC Construction Permit Nos.
CPPR-72 and CPPR-73 for the Sequoyah Nuclear Plant l'n t t s 1 and 2 facility,
and to the discuss.on of'our findings held with C. E.
Cantrell at the con-
clusion of the inspection.
Areas examined during the inspection and our findtngs are discussed in the
enclosed inspection report
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and oriservations by the inspector
Within the scope of this inspection, no items of nuncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Ruler of Practice", Part 2,
a copy of this letter and the enclosed
Title 10, Code of lederal Regulations,
inspection repcrt .ill be placed in the NRC's Publu Document Room.
If this
report contains any information that you (or your cont ract or) believe to be
proprietary, it is necessary that you make a written application within
20 days to this of f n e to withhold such inf ormation t rom public disclosure.
Any such application must include a ful1 statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that ,coprietary information identified in the application is
contained in a separate part of the document.
It we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
2288
353
.
79060100g
.
9
APR 0 21979
,
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
'
Sincerely,
j
[
Charles E. Murphy,
ief
Reactor Construction and Engineering
Support Branch
Enclosure
Inspection Report Nos. 50-327/79-17
and 50-328/79-10
cc w/ encl:
J. E. Gilleland
Assistant Manager of Power
500C Chestnut Street Tower 11
Chattanooga, TN 37401
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
2288
- ,54
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10Cl31 C
Knoxville, TN 37902
D. L. Lambert, Project Engineer
400 Chestnut Street Tower 11
Chattanooga, TN 37401
4