ML19263D683

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-456/79-02 & 50-457/79-02 on 790207-09.No Noncompliance Noted
ML19263D683
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/07/1979
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19263D684 List:
References
NUDOCS 7904130140
Download: ML19263D683 (2)


See also: IR 05000456/1979002

Text

Y

.,

TJ3% .

/*""%,

UNITED STATES

,

4

NUCLEAR REGULATORY COMMISSION

'

ye

j

}*

j

REGloN til

,

  • 2

799 ROOSEVELT ROAD

<,

GLE N E LLYN, ILLINots 60137

.....

p2?.

-7. 1979

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

P. O. Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspeweion conducted by Messrs C. E. Jones

and K. R. Naidu of this office on February 7-9, 1979, of

activities at Braidwood Nuclear Power Station, Units 1 and 2

authorized by NRC Construction Permits No. CPPR-132 and

CPPR-133 and to the discussion of our findings with Mr. R. Cosaro

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas

examined during the inspection. Within these areas, the

inspection consisted of a selective examination of procedures

and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified

during the course of this inspection.

,

In accordance with Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the enclosed inspection report will

be placed in the NRC's Public Document Room, except as follows.

If this report contains information that you or your contractors

believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure.

The

application must include a full statement of the reasons for

which the information is considered proprietary, and should be

-

prepared so that proprietary information identified in the

application is contained in n enclosure to the application.

7904130190

.

,

.

.

Commonwealth Edison

-2-

Company

K'2 -2 1979

We will gladly discuss any questions you have concerning this

inspection.

~

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

lE Inspection

Report No. 50-456/79-02

and No. 50-457/79-02

cc w/ encl:

Mr. R. Cosaro, Project

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean llansell, Office of

Assistant Attorney General