tan asc oq[o UNITED STATES NUCLEAR REGilLATORY COMMISSION
[,
,g HEGION IV 7
f
.. c G11 RYAN PLAZA DRIVE, SulTE 1000
[
gv f
' *=*
February 20, 1979 In Reply Refer To:
RIV Docket fio. 50-446/79-03 Texas Utilities Generating Company ATTN:
Mr. R. J. Gary, Executive Vice President and General Manager 2001 Bryan Tower Dallas, Texas 75201 Gentlemen:
This refers to the inspection activities performed by our Resident In-spector, Mr. R. G. Taylor, of activities authorized by NRC Construction Permit flo. CPPR-127 for the Comanche Peak Steam Electric Station, Unit 2, and to the discussion of the findings by the inspector with members of your staff on February 15, 1979.
During the inspection, it was found that certain activities under your license appear to be in noncompliance with Appendix B to 10 CFR 50 of the NRC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."
The item of noncompliance and references to the pertinent requirements are identified in the enclosed Notice of Violation.
Details of this item will be included in an inspection report to be issued in the near future and identified as Inspection Report No. 50-445/79-03; 50-446/79-03.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regul ations.
Section 2.201 requires you to submit to this office, with-in 30 days of your receipt of this notice, a written statement or expla-nation in reply including: (1) corrective steps which have been taken by you, and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.
790321o 2-(o
Texas Util~ities Generating Company
_2_
February 20, 1979 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/
.?:6 4 / i & r W. C. Sef c}le, Chief Reactor Construction and Engineering Support Branch
Enclosure:
Appendix A, flotice of Violation cc: w/ enclosure Texas Utilities Generating Company ATTil: Mr. H. C. Schmidt, Project flanager 2001 Bryan Tower Dallas, Texas 75201 e