U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.
78-12 Docket No.
70-1100 Safeguards Group 3
License No. SNM-1067 Priority 1
Category UR Licensee:
Combustion Engineerino, Incorocrated P. O. Box 500 Windsor, Connecticut 06095 Facility Name:
Nuclear Power Systems - Manufacturing Inspection at:
Windsor, Connecticut Inspection conducted.
December.12-14,1978
/q[79 Inspectors:
lo y, Mathematical Statistician
/
f date signed date signed date signed Approved by:
J H. Joyner,f h ef, Nuclear Material
/-/2-77
.ontrol dupport dection, dareguards date signed Branch Inspection Summary:
Inspection on De ember 12-14,1978 (Recort No. 70-1100/78-12)
Areas Inspected:
Routine, unannounced inspection by a regional based inspector of nuclear material control and accounting including: measurement and statistical controls, and inventory difference (ID) and its associated limit of error (LEID).
The inspection involved 22 inspector-hours onsite by one NRC inspector.
Results:
Of the two areas inspected, no apparent items of noncompliance were identified in one area, and one apparent item of noncompliance was, identified in one area (infraction-failure to correctly detemine the inventory difference bias for the material balance period ending July 13,1978 - para. 3).