ML19263C849

From kanterella
Jump to navigation Jump to search
IE Insp Rept 70-1100/78-12 on 781212-14.Noncompliance Noted: Failure to Correctly Determine Inventory Difference Bias for Matl Balance Period Ending 780713.Details Withheld (Ref 10CFR2.790)
ML19263C849
Person / Time
Site: 07001100
Issue date: 01/12/1979
From: Holody D, Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19263C846 List:
References
70-1100-78-12, NUDOCS 7903120038
Download: ML19263C849 (1)


Text

'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No.

78-12 Docket No.

70-1100 Safeguards Group 3

License No. SNM-1067 Priority 1

Category UR Licensee:

Combustion Engineerino, Incorocrated P. O. Box 500 Windsor, Connecticut 06095 Facility Name:

Nuclear Power Systems - Manufacturing Inspection at:

Windsor, Connecticut Inspection conducted.

December.12-14,1978

/q[79 Inspectors:

lo y, Mathematical Statistician

/

f date signed date signed date signed Approved by:

J H. Joyner,f h ef, Nuclear Material

/-/2-77

.ontrol dupport dection, dareguards date signed Branch Inspection Summary:

Inspection on De ember 12-14,1978 (Recort No. 70-1100/78-12)

Areas Inspected:

Routine, unannounced inspection by a regional based inspector of nuclear material control and accounting including: measurement and statistical controls, and inventory difference (ID) and its associated limit of error (LEID).

The inspection involved 22 inspector-hours onsite by one NRC inspector.

Results:

Of the two areas inspected, no apparent items of noncompliance were identified in one area, and one apparent item of noncompliance was, identified in one area (infraction-failure to correctly detemine the inventory difference bias for the material balance period ending July 13,1978 - para. 3).

Region I Form 12 (Rev. April 77)

.