Forwards IE Bulletin 79-01, Environ Qualification of Class IE Equipment. W/List of 11 Systematic Evaluation Program Plants for Which No Action Is Required
ML19263C667
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 02/08/1979
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
References
NUDOCS 7902280461
Download: ML19263C667 (1)


Text

UNITED STATES CEf1 TRAL FILES

>R micoq o

NUCLEAR REGULATORY COMMISSION PDR:HQ

/

o REGION Iv LPDR

{

E G11 RYAN PLAZA DRIVE, SUITE 1000 g

g.

AR LINGTON, TEX AS 76011 3

+...+

February 8,1979 Docket flos. 50-368 50-313 Arkansas Power and Light Company ATTN:

Mr. William Cavanaugh III Executive Director of Generation and Construction Post Office Box 551 Little Rock, Arkansas 72203 Gentlemen:

Enclosed is IE Bulletin 79-01.

It requires action by you with regard to power reactor facilities with an operating license except for the 11 SEP plants which are listed in Enclosure 3.

This Bulletin is also being sent for information to the 11 SEP plants and all power reactor facilities with a construction permit.

No action or written response is required for construction permit facilities or the 11 SEP plants.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, 1

sf, Karl V. Seyfrit Director

Enclosures:

1.

IE Bulletin No. 79-01 2.

List of IE Bulletins Issued in the past 12 months 3.

List of SEP Plants (11) 0 7902280441

..g UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Bulletin No. 79-01 Date:

February 8,1979 Page 1 of 3 ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Description of Circumstances:

The intent of IE Circular 78-08 was to highlight to all licensees important lessons learned from environmental qualification deficiencies reported by individual licensees.

In this regard, licensees were requested to examine installed safety-related electrical equipment and determine that proper documentation existed which provided assurance that this equipment would function under postulated accident conditions. The scope of IE Circular 78-08 was much broader than other previously issued Bulletins and Circulars (such as IEB 78-04 and IEB 78-02) which addressed specific component failures.

The intent of this Bulletin is to raise the threshold of IE Circular 78-08 to the level of a Bulletin; i.e., action requiring a licensee response.

Inspections conducted to date by the NRC of licensees' activities in response to IE Circular 78-08 have identified one component which licensees have found to be unqualified for service within the LOCA environment.

Specificially, unqualified stem mounted limit switches (SMLS), other than those identified in previously issued IE Bulletin 78-04, were found to be installed on safety-related valves inside containment at both Duane Arnold and Quad Cities 1 and 2 Nuclear Generating Stations.

The unqualified switches are identified as NAMC0 Models SL2-C-ll, S3CML, SAI-31, SAI-32, D1200j, EA-700 and EA-770 switches.

According to the manufacturer, these switches are designed only for general purpose applications and are not co~nsidered suitable devices for service in the LOCA environment.

Consequently, switches are being replaced at the above power plants with qualified components.

Also, NRC inspection of component qualification has identified equipment which does not have documentation indicatina it is qualified for the LOCA environment.

The in s'

re-review and resolution attention from all licens of the protracted schedul DUPLICATE DOCUMENT requesting the power reac expedite completion of the Entire document previously IE Circular 78-08 dated ML entered into system under: