Text

p

.

M CA

' '

UNITED sT ATEs

j

f

pm Arco

+

o,

NUCLEAR REGULATORY COMMISSION

id ' -

'

y/[7

REGloN H

3 v, (

- -

"- '

r

101 M ARIETT A STREET, N.W.

o, '

8

ATL ANT A, GEORGI A 30303

% ...**/

JAN 121979

In Reply Refer To:

RII:BRC

50-416/78-23

50-417/72-23

Mississippi Power and Ligh: Company

ATTN:

Mr. Norris L. Stample y

Vice President of Production

P. O. Box 1640

Jackson, Mississippi 39205

Gentlemen:

This refers to the inspection conducted by Mr. B. R. Crowley of this office

on December 27-29, 1978, of activities authorized by NRC Construction Permit

Nos. CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Statten, Units 1 and 2

facility, and to the discussion of our findings held with Mr. J. C. Fuller at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document. If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

.

7sozzsc#/6

.

.

JAN 19 p-

-

Mississippi Power and Light Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

Charles 1.'riur iy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

Inspection Report Nos. 50-416/78-23

50-417/78-23

cc w/ encl:

Mr. W. L. Nail

Plant Superintendent

P. O. Box 756

Port Gibson, Mississinpi 39150

>