| Site: | Grand Gulf |
| Issue date: | 01/12/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Stampley N MISSISSIPPI POWER & LIGHT CO. |
| Shared Package | |
| ML19263C656 | List: |
| References | |
| NUDOCS 7902280446 | |
| Download: ML19263C655 (2) | |
See also: IR 05000416/1978023
Text
p
.
M CA
' '
UNITED sT ATEs
j
f
pm Arco
+
o,
NUCLEAR REGULATORY COMMISSION
id ' -
'
y/[7
REGloN H
3 v, (
- -
"- '
r
101 M ARIETT A STREET, N.W.
o, '
8
ATL ANT A, GEORGI A 30303
% ...**/
JAN 121979
In Reply Refer To:
RII:BRC
50-416/78-23
50-417/72-23
Mississippi Power and Ligh: Company
ATTN:
Mr. Norris L. Stample y
Vice President of Production
P. O. Box 1640
Jackson, Mississippi 39205
Gentlemen:
This refers to the inspection conducted by Mr. B. R. Crowley of this office
on December 27-29, 1978, of activities authorized by NRC Construction Permit
Nos. CPPR-118 and CPPR-119 for the Grand Gulf Nuclear Statten, Units 1 and 2
facility, and to the discussion of our findings held with Mr. J. C. Fuller at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the
basis of which it is claimed that the information is proprietary, and should
be prepared so that proprietary information identified in the application is
contained in a separate part of the document. If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room.
.
7sozzsc#/6
.
.
JAN 19 p-
-
Mississippi Power and Light Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
Charles 1.'riur iy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
Inspection Report Nos. 50-416/78-23
50-417/78-23
cc w/ encl:
Mr. W. L. Nail
Plant Superintendent
P. O. Box 756